Laserfiche WebLink
lclp <br />A summary of the anticipated project elements are as follows. <br />• Geotechnical investigation <br />• Cultural Resources Assessment <br />• NEPA Categorical Exclusion (CE) in coordination with WSDOT <br />• Traffic control <br />• Erosion control <br />• Pavement and overlay design <br />* Guardrail design <br />• Site restoration <br />The specific scope of work for these improvements is described in the following tasks. <br />Page 12 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpa.com <br />