My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Service Agreement McKinstry Event Center 102620
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Professional Service Agreement McKinstry Event Center 102620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:52:58 PM
Creation date
10/29/2020 1:52:48 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
c
Item
Request to Approve a Professional Service Agreement with McKinstry for the Event Center
Order
3
Placement
Consent Agenda
Row ID
68283
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Professional Services Agreement (rev. 09/24/2018) <br />Page 13 of 18 <br />EXHIBIT "A" <br /> <br /> SCOPE OF WORK <br /> <br />In addition to providing all material and labor, the Contractor shall perform the following: <br /> <br />Scope of work, Per McKinstry Letter dated October 13, 2020, includes equipment, labor and <br />materials to perform the following work: <br /> <br />• Permits as required for the build. <br />• Shutdown and Isolation (2) Outdoor Units. <br />• Refrigerant recovery of the two systems <br />• Demolition consists of the following: <br />• Remove and dispose of (2) Outdoor Units. <br />• Demo and recycle existing refrigeration piping as shown on drawings. <br />• Remove and preserve the outside air louver and plenum. (To be re-installed <br />once complete) <br />• Remove and recycle (2) existing cooling coils located in the Mezzanine. <br />• <br />• <br />• <br />• Equipment, Rentals, and Materials included in quote: <br />• (2) Trane 20-Ton air cooled condensing units. <br />• (2) Trane cooling coils <br />• Forward reach forklift rental for demo and installation use <br />• Installation consists of the following: <br />• (2) Trane condensing units on the existing concrete pads. <br /> <br />EXCLUSIONS <br />• Electrical work of any nature <br />• Sales, Use and B&O tax <br />• Hazardous materials assessment, removal, or disposal <br />• Any work not specifically noted as included in this proposal <br />• Unforeseen and hidden conditions <br />• Engineering, calculations, drawings and peer review services <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.