My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-28-minutes-public-works-study-session
>
Meetings
>
2020
>
10. October
>
2020-10-20 10:00 AM - Commissioners' Agenda
>
2020-09-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 1:49:11 PM
Creation date
10/15/2020 1:43:24 PM
Metadata
Fields
Template:
Meeting
Date
10/20/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
67830
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
==51111011 <br />of Trw"Portmam <br />l�weaq <br />'A &Iw.,vdw {,vas rww�:Sv <br />Aviation Revitalization Loan <br />Application Project Data Sheet <br />Complete a separate Project Data Sheet for each project listed from the AirportAid Application (Form 900-031 <br />1. Project Category (Select One Only) <br />�✓ Hangar ❑ Fueling ❑ Infrastructure ❑ Passenger Amenities ❑ Property ❑ Other <br />❑ New New 0 Utilities ❑ Terminal ❑ Business Park <br />❑ Replace ❑ Replace ❑Apron ❑ Parking ❑ Retail <br />❑ Renovate ❑Upgrade Taxiway ❑ RestauranUFood ❑Other <br />❑ Other ❑ Other ❑ Other ❑ Rental <br />❑ Other <br />2. Detailed Project Description /Approach to Accomplishing Project: <br />This project extends utilities to 12 additional buildable lots for hangar development. The taxilane extension <br />would be approximately 300 feet by 25 feet wide and support four new hangars. <br />3. Project Justification: <br />The airport's available hangar lots are not equipped with utilities needed to support future hangar <br />development. The airport currently has deposits and a waiting list for land leases to build hangars. <br />4. Cost Estimate Details: Source of project Cost Estimate - Engineering Estimate <br />A detailed project estimate is included in this application package; however, the total cost of engineering and <br />construction of the electrical utility and taxilane is approximately $485,000 <br />5. Project Schedule: <br />Expected Start of Project: 12/01/2020 Expected Completion of Project: 5/3 1/202 1 <br />Start of Work Covered by Loan: 12/01/2020 Completion of Work Covered by Loan: 5/31/2021 <br />Submit a detailed project schedule (to include project milestones). Submitting project schedule via: Emailing - Ele <br />S. Other Supporting Project Documentation (Required): <br />Submit a spending and repayment plan identifying anticipated loan expenditures Submitting via: Emailing - Electronic Docun <br />and repayment schedule by month. <br />Submit job creation data using the Aviation Economic Impact Calculator. Submitting via: Emailing - Electronic Docun <br />7. Other Supporting Project Documentation (As Applicable): <br />Submit documentation supporting your consultant selection process. Submitting via: Emailing - Electronic Docun <br />Submit a copy of your consultant's Scope of Work. Submitting via.' Emailing - Electronic Docun <br />Have project plans and specifications been prepared? ❑ Yes ❑ No <br />Has the property been appraised? ❑ Yes ❑ No <br />FAA AIP Project Number (if any): N/A <br />FAA Grant Contract Number (if any): N/A <br />Other supporting documentation? <br />DOT Form 900-031 A <br />Revised 01/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.