Laserfiche WebLink
A fC�SCNDL4 _.. TOSol <br />F <br />KITTIT>5 COLiM1 11 <br />KITTITAiS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />TO: Ms. Lindsey Ozbolt, Planning Manager <br />COPY: Candie Leader, Administrative Assistant <br />DATE: January 9, 2020 <br />FROM: Mark R. Cook, Director <br />RE: Marian Meadows Development Agreement, December 2019 <br />I have reviewed the submitted materials supporting the requested "Update" to the Development <br />Agreement for Marian Meadows. My comments appear below for your consideration. <br />1. July 31, 2109 letter from CDS regarding Marian Meadows Development Agreement (DV - <br />19 -00001), Public Works comments dated 07/23/2019, at number 3: "Pursuant to <br />Ordinance No. 2018-006, Public Works' condition of approval 11.3.9 requires right-of- <br />way (ROW) with sufficient width to all for the storage of snow within that space without <br />impacting the travel lanes." <br />2. September 3, 2019 letter from CDS regarding Marian Meadows Development Agreement <br />(DV -19-00001), "First Review and Request for Corrections/Additional Information". Page <br />5 comment number 3 under "Engineering": "Pursuant to Ordinance No. 20108-006, <br />Public Works' condition of approval 11.3.9 requires a right-of-way (ROW) with sufficient <br />width to allow for the storage of snow within that space without impacting the travel <br />lanes." <br />3. TAB "Response to first staff comments Public Works, number 3 states the following: <br />"Public ROW is 60" wide plus additional land set aside (1 acre) as snow storage. See <br />Engr. Drawings and Attachment 3. A question is ownership of this tract of land: <br />condition #18 requires this to be dedicated Public ROW." <br />In response, we presume the inch (") symbol should be foot symbol ('). Public Works will <br />not accept any tract of land separate from the right-of-way for snow storage. The <br />minimum right-of-way width supporting snow storage is eighty feet (80'). All public roads <br />require supporting land dedication to Public Works. <br />4. TAB "Response to first staff comments Public Works, number 8 attempts to address our <br />concerns relative to phasing and water availability. Simply stated, there can be no <br />development requiring water service without the water service being in place and <br />available at the time of phased development. This response suffices for number 9 as <br />well. <br />5. TAB "E", page 5 of 5: "B 9": Fails to describe and assign oversight of all stormwater <br />facilities not located within public rights-of-way. <br />411 N. Ruby, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />