My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ...- <br />unless it is renewed. <br />See attached additional terms and conditions which are incorporated by reference as if set <br />fo rth in ful I herein. <br />Purveyor: Easton Water District <br />PO Box 68 <br />Easton WA 98925 <br />Phone 509-656-0284 <br />President/Commissioner: __ (Z~I-a_/>-,.-1-----~A~--,··_ 0 _. __ Date: <br />Attest : ~ 'f--17 -il <br />Secretary/Comm issioner ------------Date: -------Paid by -------------------Date: ------- <br />ADDITIONAL PROVISIONS TO <br />WATER CERTIFICATE OF AVAILABILITY <br />The following terms and conditions are hereby made a part of and incorporated by <br />reference into the certificate of availability ("Certifi cate") t o which it is attached: <br />A. Limitation. The Certificate is based upon a brief analysis of the capacity of <br />District's general and local facilities and upon informat ion provided by th e <br />property owner. The Certificate may state that additional facilities must be <br />installed as a condition to service but that is just a preliminary e stimate. T he full <br />nature a nd extent of th ose facilities may require an engineering study to be <br />pe rformed by the property owner. Di strict s hall have no responsibility if su ch <br />preliminary estimate is incorrect or incomplete. <br />B. Certificate Not a Contract. Th e Certificate is not a contract for a water <br />connection. It is only a statement that water service is presently available to the <br />subject property based on information presently known to the District and <br />info rmation prov ided by the property owner. <br />C. Fees and C harges. A water service connection to the subject property is subject to <br />the rates and charges of the Distri ct. T hese may include connection charges, <br />reimbursement charges, surcharges and other charges and are subject to change <br />from time to time with out notice. It is the owner's res ponsibility to check with th e <br />District in a dvance to determine the total amount due for the connection sought. <br />The Certifi cate does not fix or "lock-in" any charges . <br />D. Unavailabili ty of Service. The D istrict shall not be responsib le for the <br />unavailability of water service as a result of events beyond its control, including, <br />but not limited to, earthquakes, slides, flood s and other acts of God, the <br />unavailability of government p e m1its and approvals, S EPA requirements, the <br />2
The URL can be used to link to this page
Your browser does not support the video tag.