My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.5 Washington Department of Health {DOffi <br />11.5 .1 DOH submitted comments on July 20, 2017 stating that the Easton Water District <br />system can serve the expected number of additional connections. DOH requires the <br />following: <br />11.5 .1.1 Marian Meadows/Easton Water District shall confirm an intended connection <br />to the Easton Water District, and then submit estimated water usage <br />quantities, so that DOH can determine whether the precise number of new <br />connections that are proposed for Marian Meadows can be served by the <br />existing system, or apply for a new Group A Community public water <br />system with the DOH Office of Drinking Water. <br />11.5 .1.2 Marian Meadows shall identify how wastewater will be managed. <br />11.5 .1.3 The Applicant shall submit documentation and engineering design for <br />proposed water extension to DOH for the review and approval. <br />11.5.1.4 County Analysis <br />The County has no further analysis in relation to State DOH requirements. <br />11.6 Kittitas Countv Enviro.nmeittal Health <br />11.6.1 <br />11.6.2 <br />In order to satisfy Environmental Health requirements the applicant must provide <br />written documentation from the water purveyor indicating the water district commits <br />the appropriate number of connections for the entire project (made therefore <br />unavailable to any other lots) prior to final signoff. Additionally the design approval of <br />the large onsite septic system must be submitted to Washington State Department of <br />Health for approval through the state LOSS process. <br />County Analysis <br />No further analysis is required in regard to these requirements. <br />11. 7 Kittitas ounty Fi.-c Disttict # 3 <br />11. 7 .1 In a comment letter dated July 1 ?11\ 201 7, The Kittitas County Fire District #3 listed <br />several concerns. These concerns include updrafts on slopes, and excessive density <br />allowing wildfires to spread, and congestion associated with a single access which may <br />prevent firefighter access to the development. The Fire District also states that <br />construction of the town houses may necessitate a ladder engine the District currently <br />does not possess, along with the infrastructure to store it. <br />11.7.2 County Analysis <br />Mitigation measures are listed in the FEIS. They include: <br />11. 7 .2.1 Avoid residential lots in the steep forested portion of the site. <br />11. 7 .2 .2 Provide secondary access via bridge over Yakima River or from the north <br />and connecting to Silver Creek Road. <br />11.7.2.3 Maintain road grades no greater than 10%. <br />9
The URL can be used to link to this page
Your browser does not support the video tag.