Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF WORK <br />In addition to providing all material and labor, the Contractor shall perform the following: <br />The electrical portion of the work, which includes adding 120 -volt receptacles for new <br />audio/visual equipment including cameras and television screens. <br />i. per the drawings as provided and attached to this document. <br />z. include new outlets as shown in red on the drawings. <br />3. utilize predominately Wiremold raceway, boxes, and fittings as most of the work will occur <br />in finished areas of the government building. <br />4. Superior Court Room: coordinate with other trades to install the new outlets in the new <br />walls that are being constructed as part of this project. <br />s. Clarification: there is no electrical work in the Sheriff's Office Conference Room. <br />6. Includes labor at Washington State Prevailing Wage rates. <br />Work is to be completed by October 2, 2020. <br />Professional Services Agreement (rev. 09/24/2018) <br />Page 13 of 18 <br />