My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-152 Task Order 2
>
Meetings
>
2020
>
09. September
>
2020-09-15 10:00 AM - Commissioners' Agenda
>
Res-2020-152 Task Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:16:17 AM
Creation date
9/23/2020 11:16:09 AM
Metadata
Fields
Template:
Meeting
Date
9/15/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution to Authorize the Chairman's Signature on the Watershed Sciences and Engineering Task Order No. 2 for the Hanson Pits Channel Mitigation and Avulsion Risk Assessment
Order
7
Placement
Consent Agenda
Row ID
66566
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions: <br />o This task will allow the County to identify a range of options that will meet the stated <br />goals and objectives. Phase 2 of this effort will be to engage stakeholders as <br />appropriate to help selecVrefine a preferred alternative. Phase 2 is not included in this <br />task assignment. <br />. Deliverables will be included in the project report. <br />. Cost Estimates will not be prepared for the alternatives. <br />. Consultant and Gounty staff will participate in a 2-hour video conference call to identify <br />the four alternatives to test. <br />9. Meeting with County Staff to Review Investigation Results <br />Following Task 8, the Consultant and County staff shall participate in a 2-hour video conference <br />callto review and discuss the results of the investigation. Meeting outcomes shall include: <br />. Determining whether alternatives should be refined, or if additional alternatives should <br />be considered and evaluated. <br />. Selection of the alternative that appears to meet project goals and objectives. <br />Deliverables: <br />. Power Point presentation of the investigation results. <br />Assumptions: <br />r Alternative refinements or creating / testing additional alternatives may require a contract <br />modification. <br />. Consultant and County staff shall participate in a 2-hour video conference call to review <br />the results. <br />10. Technical Report <br />The results of the investigation shall be summarized in a technical report which will be provided <br />to the County for review. The technical report will present: <br />. Project goals, objectives, and constraints, <br />. Descriptions of existing hydrologic, hydraulic and geomorphic conditions. <br />. Four alternatives including a concept-level overview sketch of each. <br />r Anticipated alternative performance including discussion of avulsion and channel <br />migration potential. <br />. Evaluation matrix and the rationale for the selection of a preferred alternative. <br />Deliverables: <br />. Draft and final report. <br />Assumptions: <br />r County staff will review the draft report and provide a single set comments to the <br />Consultant. <br />o The Consultant will address the County comments in the final report.
The URL can be used to link to this page
Your browser does not support the video tag.