My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-152 Task Order 2
>
Meetings
>
2020
>
09. September
>
2020-09-15 10:00 AM - Commissioners' Agenda
>
Res-2020-152 Task Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:16:17 AM
Creation date
9/23/2020 11:16:09 AM
Metadata
Fields
Template:
Meeting
Date
9/15/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution to Authorize the Chairman's Signature on the Watershed Sciences and Engineering Task Order No. 2 for the Hanson Pits Channel Mitigation and Avulsion Risk Assessment
Order
7
Placement
Consent Agenda
Row ID
66566
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
€+WATERSH ED <br />SCIENCE & ENGINEERING <br />110 Prefontaine Place South, Suite 508 <br />Seattle, WA 98104 <br />Tel. (206)521.3000 <br />Direct Detail <br />Cost <br />Estimate of Professional Services <br />Prepared for: Kittitas County <br />Project: Yakima River Hanson Pits <br />Channel Migration/Avulsion AssessmentOate: September 2,2020 <br />Prepared By: Jeff Johnson / Dan Scott <br />DESCRIPTION lot.l! <br />2 6I 6 <br />z. rrojecl 9oars, volec(ves, uonsrarn6 ano Evatualton untefla 2t <br />J, OaUlyrreurc arro ropograpnE-uruey 0.5 1t 1 <br />1. Tteru neconilatssance I <br />c. nyororogy Kevrew 4 <br />c. nyorauilu rvroueililg 4 I 80 <br />/. 9EOrIlotpiltu nssesstrlent 60t 24 <br />I <br />t, Atretilauve uoltceprs anq Evalualon 20 <br />I I,. rvreelilg wtro uour[y DIatr Io xevtew tnves[ganon Kesu6 I 6 <br />I <br />tu. tectnlrcat Keporl I 16 4 24t 24 <br />I <br />z 2 1.435 <br />Iotal Hours and Direct Labor Co6t (DL) <br />Labor Rato ($/hr) <br />IOTAL LABOR COST $14,A77 $1,435 $j5,264 $22,053 $o $1 <br />$0.560 <br />Total <br />280 <br />2BO <br />500 $ <br />$ <br />$ <br />$ <br />54,698 <br />280 <br />54,978Tolal $ <br />Total Labor <br />Total Dhect Expenses
The URL can be used to link to this page
Your browser does not support the video tag.