Laserfiche WebLink
NGantt Chartlaborco st$ 1,400materialcost$2s0$0$250$0$250$ 1,2 s0$0$2,400$900$4,5 502020totalcost$ 1,650$84s67Team Leader/Planner - Tom Beckwith FAICPGraphic Design - Michael ArthurLandscape Design - Jennifer Kiusalaas ASIA LEEDGIS - Jennifer HackettprofIIIIIX1 Start wayfinding processa Conduct wayfinding retreat2 Create alternative conceptsa Create alternative conceptsb Review concepts with publicc Refine preferred conceptd Validate final designs,/costs,/methods3 Develop style guides, specificationsa Develop style guides/specifications/costsb Review guides/costs/schedulesc Refine guides/costs/methods,/fundingd Approve implementation!| Milestone meetings, workshops, and events4024208$ 7,000$4,200$ 3,5 00$ 1,400$0$2 s0$0$2 s0$7,000$4,450$ 3, s00$ 1,650hours8Xweeksllll24680246EgIIXXXXXXXXXXXXXXXXXXXXXXXIIIIqSubtotalContingencyProject budgetSubtotalIItillil7t282482525%$ 19,600$ 1,400$4,200$ 1,400$44,100$ 19,600$ 1,650$4,200$ 1,650$4s,3 50s2,268Public Works sign fabrication optionL-3 Start, create, develop style guides/specifications4 Implement wayfinding by public contracta Develop bid documents,/review bids X Xb Fabricate river directory by vendor - each Xb Fabricate wayfinding sign by vendor - each X$47,618$ 1,250 $47,619252241tr012765%Vendor bid sign fabrication option3a Assumes specifications for 10I single-sided wayfinding and 11 double-sided river directory signsDoes not include mounting hardware, posts, or installation.$44,10O$4,200$48,300$4,200$26,400$90,900$ 169, I 18CoI