My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_WSE TO 2_Hanson Pits
>
Meetings
>
2020
>
09. September
>
2020-09-15 10:00 AM - Commissioners' Agenda
>
Resolution_WSE TO 2_Hanson Pits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 12:15:25 PM
Creation date
9/10/2020 12:15:08 PM
Metadata
Fields
Template:
Meeting
Date
9/15/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution to Authorize the Chairman's Signature on the Watershed Sciences and Engineering Task Order No. 2 for the Hanson Pits Channel Mitigation and Avulsion Risk Assessment
Order
7
Placement
Consent Agenda
Row ID
66566
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• LiDAR data (2008/2011 and if available 2019) <br />• Technical documents including recent hydraulic and habitat reports developed as part of <br />the 2015 Yakima River Corridor Plan <br />• SRH2D hydraulic model developed for the 2015 Yakima River Corridor Plan <br />• Current and historical aerial photographs and maps <br />• Surficial soil data <br />• Yakima River discharge data <br />• River sediment grain size, supply, transport, and deposition data <br />• Design data for levees and revetments <br />Assumptions: <br />• The Consultant possesses many of these materials due to their role in the 2015 corridor <br />study. <br />• The County will assist the Consultant in obtaining materials as needed. <br />• The USGS and the DNR collected UDAR in 2019 for eastern Washington, but it may not <br />yet be available. <br />2. Project Goals, Objectives, Constraints and Evaluation Criteria <br />A meeting will be held with County staff to define project goals, objectives, constraints, and <br />alternative evaluation criteria. <br />• Goals are high level statements that describe what the project will accomplish. <br />• Objectives are more focused statements that describe specific outcomes that the project <br />should deliver. <br />• Constraints are limitations that may restrict certain actions. <br />• Evaluation Criteria are metrics used to evaluate the degree to which alternatives meet <br />the project objectives. <br />Deliverables: <br />• List of draft project goals, objectives, constraints, and evaluation criteria provided to the <br />County for review. <br />• List of final project goals, objectives, constraints, and evaluation criteria will be presented <br />in the project report. <br />Assumptions: <br />• This will be a video conference call meeting that will last 1 hour and will be led by the <br />Consultant. <br />3. Bathymetric and Topographic Survey <br />The consultant will complete a bathymetric survey of the Hanson Pits gravel extraction ponds <br />and will create a topographic map for the floor of each cell. <br />Deliverables: <br />• Bathymetric survey data in an AutoCAD file. <br />• Topography for the floor of each cell. <br />
The URL can be used to link to this page
Your browser does not support the video tag.