My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA Red Lion Hotel
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
PSA Red Lion Hotel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2020 1:25:06 PM
Creation date
9/1/2020 1:24:51 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Professional Services Agreement between the Kittitas County Public Health and the Red Lion Hotel
Order
6
Placement
Consent Agenda
Row ID
64177
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Contractor will collect soiled towels and linens as needed and replace with <br />cleaned sets once per week. Towels and linens will be placed in garbage bags <br />provided by the Contractor and placed outside of the room by the occupant to <br />prevent any contact with staff. Contractor is responsible for ensuring that staff <br />wears appropriate personal protective equipment (ppE). <br />11. Contractor will be responsible for weekly collection and disposal of garbage. <br />Garbage will be placed outside of the room by the resident to prevent any contact <br />with staff. Contractor is responsible for ensuring that staff wears appropriate <br />PPE. <br />12. The Contractor will allow County staff to perform a walk-through of rooms with <br />the Contractor before and after to determine any damage costs, detailed in <br />Exhibit D "Schedule of Costs" <br />Countu Responsibilities <br />1. County shall provide professional decontamination of each occupied room <br />between each occupant and at the conclusion of contracted services. <br />2. County shall be the sole source of referral for occupancy of designated units and <br />management of move out dates. <br />3. County shall provide PPE as needed to hotel staff for collection and processing <br />of garbage, towels, and linens. <br />4. County agrees to deliver rooms in their original state at the end of the reservation <br />period. <br />5. County is responsible for any damages (excluding regular wear and tear) or <br />missing items during the reservation period, based upon the attached schedule <br />of costs detailed in Exhibit D, "schedule of Costs." <br />6. County occupants per this contract will not be able to use common or public <br />areas of the hotel and will be instructed to remain in their designated rooms <br />unless absolutely necessary due to a health and/or safety issue. <br />Professional Services Agreement <br />Page 15 of20
The URL can be used to link to this page
Your browser does not support the video tag.