My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-145 Hungry Junction Rd
>
Meetings
>
2020
>
08. August
>
2020-08-18 10:00 AM - Commissioners' Agenda
>
Res-2020-145 Hungry Junction Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:10:47 AM
Creation date
8/21/2020 11:10:43 AM
Metadata
Fields
Template:
Meeting
Date
8/18/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the County Road Administration Board Rural Arterial Program Project Final Prospectus for the Biennium 2021-2023 for the Hungry Junction Road Widening Project
Order
7
Placement
Consent Agenda
Row ID
65752
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD <br />RURAL ARTERIAL PROGRAM <br />FINAL PROSPECTUS <br />Bienniuml 2021 - 2023 <br />Region: SE County: Kittitas <br />IDENTIFICATION <br />State Legislative District: 13 Six-Year T.l.P. Priority No: 17 Total Points: <br />Road Number(s)Road Name(s)FFc(s)TRG(s) <br />91.37 <br />BMP(s)EMP(s) <br />PROJECT TYPE <br />Project Type: 3R - Rehabilitate, Resurface, Restore <br />DESGRIPTION OF PROPOSED IMPROVEMENTS - Attach Ratinq Worksheets <br />Roadway Structural Section, or Bridge Condition: <br />The existing BST pavement is narrow with areas of significant longitudinal cracking, and settling <br />over the top of drainage structures. lt will be removed and replaced with 9 inches of CSBC and 0.30 <br />foot of HMA asphalt. <br />Horizontal Alignment: <br />31510 Hungry Junction Road 08 T3 0.0001 1.740 <br />There will be no effect on the horizontal alignment <br />Vertical Alignment: <br />are four vertical curves that need to be corrected to meet safe sight stopping distance design <br />ndards for the posted speed limit. <br />width <br />existing roadway has two - 10 foot lanes with little to no shoulder, the roadway will be widened <br />12foot lanes with 2 foot shoulders <br />Other; Clear Zone, Slopes, Guardrail, lllumination, signals etc. <br />The clear zone will be improved by removing or relocating above ground obstacles, beveling culvert <br />ends, and installing guardrail or flattening slopes where warranted. <br />ESTIMATED FUNDING AND TIMING <br />Phase EstTotal Cost RATA Amount <br />Estimated Year <br />Start End <br />Design/Prelim. Engr $461,000 $414,900 Mar-22 Jun-23 <br />Right of Way $100,000 $e0,000 Sep-22 Jun-23 <br />Construction $3,474,000 $3,126,600 Sep-23 Dec-24 <br />TOTAL $4,035,000 $3,63'1,500 Schedule of CRAB reimbursements for <br />Construction will be or dependent on Proiect <br />SPEGIAL CONSIDERATIONS THAT MAY AFFECT PROJECT SCHEDULE: <br />fiwettands flruvrs [n.o.w. flshoretines fiusrws lsrn [neA nRR <br />[WOrw @Cuttruat (Hist. Arch. Pateo.) !fieO (Other agency work) [Other <br />Zusnce <br />LOCAL PROJECT APPROVAL <br />RAP Project Prospectus prepared under the supervision of: <br />Signature -E i Date <br />u23 <br />RAP Project Prospectus submitted to CRAB with the approval of: <br />Commissioners or County Executive / Date r I B laoaoofthe Board of County <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.