Laserfiche WebLink
2020 BRIDGEGROUP c/s <br />Kittitas County 2020 Bridge lnspections Eryineer ll Engineer I <br />Design <br />Eryine€ril <br />SCOPE OFWORK $173.45 $201.69 $181.14 $124.87 $120.24 $94.6 <br />110 <br />111 Conta.l C.moliance 2 ss7 <br />5 El.S <br />1.30 Cli6nt Communication (0hone. email)10 ll,249 <br />1.40 lnlernal Proiecl Coordinallon 2 10 51,5$ <br />- <br />2.20 S6pteffi6r (1 ldp, 1 day)3 s$1 <br />6 872 <br />2.50 Dec€mberll triD. 2 davs) <br />3.12 Shod Soan lnsD6dions 16 313U <br />1Z <br />3.21 <br />12 11,# <br />3.24 QC Revi€w ofRepons 4 ls <br />3.31 $,181 <br />m t2,.ls <br />3.35 OC Revlew ofReDods 6 I il711 <br />3.36 DBff Bnd Fin8l Sldned Subdtrsls 4 #1 <br />3.44 0C R6vi6w ofR6Dods <br />3.50 Novomber Bidoes {29 NBl. 4 Shod SDans) <br />3.51 Cflice Pr€p Work I ls2 <br />n6o€ctions 30 33.S7 <br />353 48 s6m <br />3il Short Span lnspeclions 6 sn1 <br />3.55 AC R€vi6w of Repods t6 t2,q9 <br />2 <br />3.62 <br />4.10 :fry ot Cle Elum lnspodions and R6pods (4 Shoi Spans) <br />4.12 lhotr SDan lnsoecllons 4 <br />4.13 lC Review ot Reporls $461 <br />5 % <br />Cilv nf(hnF. ln.b..llnn. End R.non< 13 Shod Sn.n.\ <br />5.11 Oflice PreD Work 2 12& <br />QC ReviewofRepois 3 tsl <br />4 0 I 73 350 5 <br />I <br />t52-546 <br />to <br />kpff Page 1 of 1