Laserfiche WebLink
O <br />I<ITTII1 T.SI COIINTTY <br />DEPARTMENT OF PUBLIC WORKS <br />For NBI reportable bridges, the KPFF Bridge lnspector will serve as inspection team <br />leader, prepare, sign, and upload routine and inventory reports to the WSBIS Bridge <br />lnspection Database. The County will provide a co-inspector for these inspections. <br />For "short-span" bridges, the KPFF Bridge lnspector will serve as inspection team leader <br />and will review (QC) the inspection report prepared by the County's co-inspector. The <br />County will provide a co-inspector who will prepare, sign and upload the "short-span" <br />bridge inspection reports to the WSBIS Bridge lnspection database. <br />The field inspection schedule is anticipated to be as provided below: <br />TASK NO.3.10 -August 2020: County Bridge Inspections <br />. 16 "short-span" bridge inspections <br />. 1 trip <br />o 2 days of on-site inspection with one overnight stay <br />TASK NO. 3.20 - September 2020= County Bridge lnspections <br />. 7 NBI bridge inspections <br />. 1 day of on-site inspection <br />a <br />a