My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Prospectus Hungry Jct
>
Meetings
>
2020
>
08. August
>
2020-08-18 10:00 AM - Commissioners' Agenda
>
Resolution_Prospectus Hungry Jct
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 1:15:06 PM
Creation date
8/13/2020 1:14:58 PM
Metadata
Fields
Template:
Meeting
Date
8/18/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the County Road Administration Board Rural Arterial Program Project Final Prospectus for the Biennium 2021-2023 for the Hungry Junction Road Widening Project
Order
7
Placement
Consent Agenda
Row ID
65752
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD <br />RURAL ARTERIAL PROGRAM <br />FINAL PROSPECTUS <br />Biennium: 2021 - 2023 <br />Region: SE County: Kittitas <br />IDENTIFICATION <br />State Legislative District: 13 Six -Year T.I.P. Priority No: 17 Total Points: 91.37 <br />Road Number(s) I Road Name(s) FFC(s) I TRC(s) I BMP(s) I EMP(s) <br />31510 Hungry Junction Road 08 T3 1 0.0001 1.740 <br />PROJECT TYPE <br />Project Type: 313 - Rehabilitate, Resurface, Restore <br />DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets <br />Roadway Structural Section, or Bridge Condition: <br />The existing BST pavement is narrow with areas of significant longitudinal cracking, and settling <br />ever the top of drainage structures. It will be removed and replaced with 9 inches of CSBC and 0.30 <br />foot of HMA asphalt. <br />Horizontal Alignment: <br />There will be no effect on the horizontal alignment. <br />vcniwi rwiynnronr. <br />There are four vertical curves that need to be corrected to meet safe sight stopping distance design <br />standards for the posted speed limit. <br />vviun I. <br />The existing roadway has two - 10 foot lanes with little to no shoulder, the roadway will be widened <br />to 12 foot lanes with 2 foot shoulders. <br />Dther: Clear Zone, Slopes, Guardrail, Illumination, sianals etc.: <br />The clear zone will be improved by removing or relocating above ground obstacles, beveling culvert <br />ends, and installing guardrail or flattening slopes where warranted. <br />STIMATED FUNDING AND TIMING Estimated Year <br />Phase Est Total Cost RATA Amount Start End <br />Design/Prelim. Engr. <br />$461,000 <br />$414,900 <br />Mar -22 <br />Jun -23 <br />Right of Way <br />$100,000 <br />$90,000 <br />Sep -22 <br />Jun -23 <br />Construction <br />$3,474,000 <br />$3,126,600 <br />Sep -23 <br />Dec -24 <br />TOTAL <br />$4,035,000 <br />$3,631,500 <br />Schedule of CRAB reimbursements for <br />Construction will be or dependent on Pro ect <br />SPECIAL CONSIDERATIONS THAT MAY AFFECT PROJECT SCHEDULE: <br />v❑Wetlands Z✓ NMFS ❑✓ R.O.W. ❑./ Shorelines ❑✓ USFWS ❑BIA ✓ZHPA F -IRR F/ USACE <br />❑✓ WDFW Q✓ Cultrual (Hist. Arch. Palen.) Tied (Other agency work) Other <br />LOCAL PROJECT APPROVAL <br />RAP Project Prospectus prepared under the supervision of: <br />RAP Project Prospectus submitted to CRAB with the approval of: <br />vol 4Ze <br />Signature - County Engineer / Date <br />Signature of Chair of the Board of County <br />Commissioners or County Executive / Date <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.