My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_KPFF TO 2_Bridge Inspection
>
Meetings
>
2020
>
08. August
>
2020-08-18 10:00 AM - Commissioners' Agenda
>
Resolution_KPFF TO 2_Bridge Inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 1:15:16 PM
Creation date
8/13/2020 1:14:58 PM
Metadata
Fields
Template:
Meeting
Date
8/18/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on KPFF Task Order No. 2 - 2020 Bridge Inspection Support Services
Order
8
Placement
Consent Agenda
Row ID
65752
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'`� G``` KZTTITAtS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />KITTITAS COUNTY <br />ITEM NO. 4.0 — CITY OF CLE ELUM BRIDGES <br />See Item No. 3.0 for description of work <br />TASK NO. 4.10 — City of Cie Elum Bridge Inspections <br />• 4 "short -span" bridge inspections <br />• Combined with December trip to perform County inspections <br />ITEM NO. 5.0—TOWN OF KITTITAS BRIDGES <br />See Item No. 3.0 for description of work <br />TASK NO. 5.10 — Town of Kittitas Bridge Inspections <br />• 3 "short -span" bridge inspections <br />• Combined with December trip to perform County inspections <br />ITEM NO. 6.0 — BRIDGE INSPECTION REPAIR LIST <br />Upon completion of all bridge inspections, KPFF will compile a list of all repairs for the 2020 <br />County bridges (including short spans). This list will be in Microsoft Excel format. <br />ASSUMPTIONS <br />• New Construction at Fairview Road Bridge will replace existing short span bridges <br />89141 -OB, 89142 -OB, and 89144 -OB. Inspections for the existing bridges do not need <br />to be performed this year. <br />• No allowance is made for weather in the attached fee. Our general policy is to inspect in <br />difficult weather conditions but not engage in conditions or situations resulting from the <br />weather that the Team Leader feels are clearly unsafe. If such situations arise the <br />inspection will be rescheduled for as -soon -as -possible. Additional costs resulting from <br />weather delays will be issued to the County prior to any changes of the current schedule <br />or budget, for approval. <br />• The County will provide a Co -Inspector that will assist the KPFF Team Leader on all <br />inspections. Should the County provided Co -Inspector not be available for the scheduled <br />trip, KPFF will provide a co -inspector. Additional costs for the KPFF provided Co - <br />Inspector and/or changes to the inspection schedule will be issued to the County for <br />review and approval prior to commencement of the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.