Laserfiche WebLink
R W'3x;.75..1gQ,�ngine Vs rvor't faring. Order. Page 1 of 1 <br />RCW 36,75.190 <br />Engineer's report Hearing—Order. <br />Upon report by the examining engineer for the erection and construction upon any <br />county road, or for acquisition by purchase, gift or condemnation of any bridge, trestle, or any <br />other structure crossing any stream, body of water, gulch, navigable water, swamp or other <br />topographical formation, which constitutes a boundary, publication shall be made and joint <br />hearing had upon such report in the same manner and upon the same procedure as in the <br />case of resolution or petition for the laying out and establishing of county roads. If upon the <br />hearing the governing authorities jointly order the erection and construction or acquisition of <br />such bridge, trestle, or other structure, they may jointly acquire land necessary therefor by <br />purchase, gift, or condemnation in the manner as provided for acquiring land for county roads, <br />and shall advertise calls for bids, require contractor's deposit and bond, award contracts, and <br />supervise construction as by law provided and in the same manner as required in the case of <br />the construction of county roads. <br />Any such bridges, trestles or other structures may be operated free, or may be <br />operated as toll bridges, trestles, or other structures under the provisions of the laws of this <br />state relating thereto. <br />[ 1963 c 4 § 36.76.190. Prior: 1937 c 187 § 29; RRS § 6450-29.] <br />https:Happ.leg.wa..gov/ROW/default.aspx?cite=36.75.190 7/16/2020 <br />