8, Indicate if other needed infrastructure (e.9,, sswer, water, power) is in place or if there is a plan for getting <br />it in place. <br />Allother necessary infrastructure improvements (water, sewer, storm, natural gas, and power) <br />were completed with the road widening in 2012, and no other infrastructure improvements are <br />needed, Also, with the previous road widening project, underground conduits for a future traffic <br />signal were installed across each of the intersection legs, so installation of the traffic signal will <br />not require road crossings. <br />9. lndicate the Estimated Number of Businesses Created/Retainsd by the Project. 73 <br />Currently there is approxim ately 220 acres of undeveloped land along the Railroad <br />Ave./Anderson Rd./Dolarway Road corridor, with the majority of the undeveloped land being <br />zoned light industrial. lf you take an average lot size of 3 acres per business, then there is the <br />potential that the proposed project can support and serye an additional 73 businesses within <br />this two and a half mile road corridor. <br />10. lndicated the Estimated Number of Short Term and/or Permanent Jobs Created/Retained by theProject. 365 <br />As stated above, the 22Q acres of undeveloped land can supporl 73 new businesses, assuming <br />3 acre lots, lf these businesses employed an average of 5 employees each, the proposed <br />project can support and serve approximately 365 employees. <br />Submit the original application to: <br />Kittitas County Department of Fublic Works <br />41tr N. Ruby, Suite #tr. <br />Ellensburg, WA 98926 <br />t3