Laserfiche WebLink
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 302-20 JOB NO: RC2091-HP <br />IT IS HEREBY RESOLVED N Thorp Hwy -Yakima River Bridge <br />The North Thorp Highway Bridge spanning the Yakima River needs preventative Maintenance to extend the life of the <br />fracture critical structure. The existing paint system has failed throughout much of the truss's bottom chord, floor beams, <br />stringers and bearings. The joint repairs will include strip seals at the ends of the truss and silicon sealant at the floor <br />beams. The truss portal members damaged by traffic impacts will be repaired by heat straightening or replacing members. <br />The concrete spalls at the piers will be repaired. Bridge will be painted. <br />ARTERIAL ❑ <br />ACCESS <br />This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />$ 580,415 <br />CONSTRUCTION ENGINEERING <br />$ 90,535 <br />RIGHT-OF-WAY ACQUISITION <br />$ 50 <br />SUB -TOTAL <br />1 ,.,, <br />7 �_ <br />$ 671,000 <br />Count Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 1,905,835 <br />SUB -TOTAL <br />7717905,835 <br />TOTAL PROJECT COST <br />$ 2,576,835 <br />GRANTOR OTHER FUNDS <br />$ 2,486,250 <br />Grant Source: HSIP <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />$ 90,585 <br />Mark Cook, P.E. <br />Interim County Engineer <br />❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2020 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 <br />IN ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. <br />ADOPTED this day of , 2020. Attest: <br />BOARD OF COUNTY COMMISSIONERS Clerk of the Board <br />KITTITAS COUNTY, WASHINGTON <br />Brett Wachsmdh, Chair <br />Laura Osiadacz, Vice -Chair Cory Wright, Commissioner <br />g'\base\forms\eng\crp-frm 6130/2020 <br />