My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_PFacilitiesAgmt_CityofEllensburg
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
Resolution_PFacilitiesAgmt_CityofEllensburg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 3:02:45 PM
Creation date
7/2/2020 3:02:03 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution for the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Ellensburg
Order
12
Placement
Consent Agenda
Row ID
64177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ELLENSBURG COMPREHENSIVE PLAN <br />Goal T-2 Prioritize connections with state highway routes and removal of <br />bottlenecks that delay the movement of people and goods. <br />Policy A Maintain interconnectedness and high levels of access through a well-developed <br />grid network and high quality connections between the walking, biking, auto, <br />freight, and transit networks. <br />Policy B Design of new streets in the city shall use a street grid system at an interval of <br />1/2 mile for arterial streets. Within the 1/2 mile sections, attempt to maintain a <br />1/4 mile connection for auto circulation, with 200 to 600 foot pedestrian <br />connections, depending on zone density. <br />Policy C For all undeveloped areas of the city and UGA, prepare maps of future street <br />alignments, especially for arterials, considering existing development patterns <br />and physical barriers such as streams and steep slopes. <br />Policy D Establish LOS B as the standard for local streets, LOS C for collectors and <br />arterials, and LOS D for the 1-90 interchanges. <br />Policy E Wherever possible, seek to increase route options through strategic additions to <br />the transportation system that fill gaps and add alternative routes. <br />Policy F Maintain and enforce truck routes through the city and ensure connection to <br />freeway interchanges. <br />Policy G Focus industrial growth along specific transportation corridors that are designed <br />to accommodate heavy vehicles and other industrial users. <br />Policy H Concentrate land uses that generate long-haul truck traffic nearby the City's <br />freeway interchange areas. <br />Policy I Ensure development regulations and street standards are current with <br />contemporary truck design criteria, particularly as they apply to those areas near <br />the freeway interchanges. <br />Goal T-3 Fill gaps in the system to accommodate safe, enjoyable, and energy <br />efficient travel by those of all abilities choosing to walk, bike, or use <br />transit. <br />Policy A Prioritize building streets, trails, linear parks, and pathways to connect <br />neighborhoods, schools, parks, and commercial areas so that walking and biking <br />are viable modes for both recreation and transportation purposes. <br />Policy B Establish bicycle and pedestrian priority networks that highlight the most critical <br />facilities to accommodate those modes. <br />CITY OF ELLENSBURG COAQPREHENSIVE PLAN o-RANSPORTATION o PAGE 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.