My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_PFacilitiesAgmt_CityofEllensburg
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
Resolution_PFacilitiesAgmt_CityofEllensburg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 3:02:45 PM
Creation date
7/2/2020 3:02:03 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution for the 2020 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Ellensburg
Order
12
Placement
Consent Agenda
Row ID
64177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ellensburg Traffic Impact Fee Project Estimate <br />Project Name: 5th Ave. and Railroad <br />General Discription: Intersection Improvements and Signalization <br />Work Item <br />Qty. <br />Unit <br />Unit Cost <br />Total <br />INTERSECTION IMPROVEMENTS <br />Mobilization <br />I <br />LS <br />$ <br />40,000.00 <br />$ <br />40,000.00 <br />Traffic Control <br />I <br />LS <br />$ <br />30,000.00 <br />$ <br />30,000.00 <br />ADA Ramps <br />8 <br />Ramp <br />$ <br />1,100.00 <br />$ <br />8,800.00 <br />Curb and Gutter <br />100 <br />LF <br />$ <br />40.00 <br />$ <br />4,000.00 <br />Sidewalk <br />100 <br />LF <br />$ <br />40.00 <br />$ <br />4,000.00 <br />Clear & Grub/Demo <br />I <br />LS <br />$ <br />6,000.00 <br />$ <br />6,000.00 <br />Removal of Structures and Obstructions <br />I <br />LS <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />Removal of Sidewalk and Curb <br />100 <br />LF <br />$ <br />4.00 <br />$ <br />400.00 <br />SIGNALIZA TION <br />Signal Poles <br />4 <br />EA <br />$ <br />28,000.00 <br />$ <br />112,000.00 <br />Pedestrian Poles <br />4 <br />EA <br />$ <br />5,000.00 <br />$ <br />20,000.00 <br />Signal Cabinet <br />1 <br />EA <br />$ <br />25,000.00 <br />$ <br />25,000.00 <br />Service Cabinet <br />I <br />EA <br />$ <br />7,000.00 <br />$ <br />7,000.00 <br />Conduit <br />200 <br />LF <br />$ <br />45.00 <br />$ <br />9,000.00 <br />Detection System <br />I <br />EA <br />$ <br />55,000.00 <br />$ <br />55,000.00 <br />Illumination <br />8 <br />EA <br />$ <br />3,000.00 <br />$ <br />24,000.00 <br />Preemption Equipment <br />I <br />LS <br />$ <br />7,000.00 <br />$ <br />7,000.00 <br />Interconnect <br />I <br />LS <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />Signal Heads <br />12 <br />EA <br />$ <br />1,200.00 <br />$ <br />14,400.00 <br />Pedestrian Heads <br />8 <br />EA <br />$ <br />800.00 <br />$ <br />6,400.00 <br />Minor Change <br />1 <br />EST <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />ENGINEERING <br />Engineering (25%) <br />EST <br />$ <br />65,000.00 <br />TOTAL: $ 460,000.00 <br />�4470 <br />GGtaTcP\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.