3. Project Construction: <br />Estimated Start Date: April 2021 Estimated End Date: Sept. 2021 <br />Please explain phase status of the project (bid ready, design complete or preliminary design). <br />When the City of Ellensburg constructed the improvements on Dolarway Road / Railroad <br />Avenue in 2011, underground conduits for a future traffic signal at the intersection of 5th Avenue <br />and Railroad Avenue were installed across each leg of the intersection. Draft signal pole <br />locations were designed at that time to ensure the conduit crossings were installed at the <br />correct location. Therefore a partial design for the traffic signal was completed at that time to <br />about and is currently about 30% complete. In addition, a complete topographic survey was <br />completed with the previous project and will only require minor updates and/or spot checking of <br />the previous survey. Completing a final design can begin immediately upon receiving grant <br />award and can be complete within 6 months. It is anticipated that the project would be out to <br />bid late -summer 2020. Due to the typical lead time for traffic signal poles, construction would <br />likely begin Spring 2021 and be completed late summer 2021. <br />4. Indicate if the project is consistent with the following applicable state, regional and local plans and <br />prioritization processes: <br />X Overall Economic Development Plan — Officially Adopted Dec. 18, 2017 <br />The following two goals are from the Economic Development Chapter of our <br />Comprehensive Plan: <br />1. Goal ED -2: Stimulate and diversify Ellensburg's economy <br />o Policy D: Encourage development of light industrial uses within the City of <br />Ellensburg (Large amount of undeveloped land within close proximity to the <br />proposed project that is currently zoned light industrial) <br />Program 1: Develop City -owned property off Dolarway Road for a <br />light industrial park (This is immediately NW of the proposed project) <br />2. Goal ED -5: Embrace tourism as an economic development tool <br />o Policy A: Market Ellensburg's tourism opportunities by developing a <br />marketing strategy to address all tourism segments (Large amount of <br />undeveloped land within close proximity to the proposed project that is <br />currently zoned light industrial) <br />® Program 5: Promote Ellensburg's role as a destination to regional <br />recreation and cultural activities (Rotary Park, immediately west of <br />the proposed project, is a regionally significant park facility. The <br />park has been expanding and now has the capability to host <br />regional sports tournaments and other recreational activities.) <br />X Comprehensive Land Use Plan — Officially Adopted Dec. 18, 2017 <br />The following goals are from the Transportation Chapter of our Comprehensive Plan: <br />1. Goal T-1: Create a transportation network that provides safe and comfortable <br />connections for all users to key destinations <br />o Policy C: Prioritize safety improvements as part of every project <br />o Policy F: Where possible provide higher comfort pedestrian facilities (The <br />proposed traffic signal includes dedicated vehicle, cyclist and pedestrian <br />movements to greatly increase the safety of the intersection and meeting <br />the intent of Policies C and F. In addition the signal will have emergency <br />10 <br />