My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
2020-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 3:03:02 PM
Creation date
7/2/2020 3:01:43 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
64177
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s'u ' <br />'��'�9-°y WASHINGTON STATE <br />Joint Aquatic Resources Permit <br />Application (DARPA) mm <br />Attachment D: <br />Construction sequence tgio <br />M <br />US Army Corps <br />of Engineers r <br />Seattle District <br />Use this attachment only if your project will be constructed in phases <br />or stages. Complete the outline showing the construction sequence <br />and timing of activities, including the start and end dates of each <br />phase or stage. <br />Use black or blue ink to enter answers in whites aces below <br />--------------------- ----------------- <br />AGENCY USE ONLY <br />i t <br />Date received: <br />t � <br />t <br />Agency reference #: <br />Tax Parcel #(s): _ <br />t <br />TO BE COMPLETED BY APPLICANT D919 <br />] i <br />t <br />Project Name: Kittitas County Waste Transfer <br />Station <br />Location Name (if applicable): Ellensburg, <br />' Kittitas County, WA ; <br />'---------------------------------------' <br />Phase <br />or <br />Start Date <br />End Date <br />Activity Description <br />Stage <br />1 <br />September 2020 <br />October 2021 <br />Roadway construction (Minor Collector) and utilities (along <br />Minor Collector and US 97) <br />2 <br />April 2021 <br />December 2022 <br />Transfer Station: <br />• Begin grading activities and prepare the site for <br />construction <br />• Prepare the stormwater and draining facilities <br />• Pave impervious surfaces <br />• Construct the buildings. <br />3 <br />March 2023 <br />April 2024 <br />Public Works Maintenance Facility: <br />• US Highway 97 improvements <br />• Begin grading activities and prepare the site for <br />construction <br />• Prepare the stormwater and draining facilities <br />• Pave impervious surfaces <br />• Construct -the buildings <br />If you require this document in another format, contact the Governor's Office for Regulatory Innovation and Assistance (ORIA) at <br />(800) 917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call <br />(877) 833-6341. ORIA publication number: ORIA-16-015 rev. 10/2016 <br />JARPA Attachment D Rev. 10/2016 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.