My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-08-minutes-public-works-study-session
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
2020-06-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 3:02:19 PM
Creation date
7/2/2020 3:01:42 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
64177
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPPER COUNTY SHOP CONTRACT INCIDENTALS <br />Mark Cook stated that with the Upper County Maintenance Facility <br />project starting he'd like to get Board direction on establishing a <br />Change Order process for the project. Mark Cook continued that <br />previously he had established a Change Order Policy for road projects <br />that allows the Director's signature on change orders at and/or below <br />fifty thousand dollars ($50,000). Discussion was held. Staff was <br />directed to draft a process for approval. <br />UPPER COUNTY TRAFFIC COMMITTEE UPDATE <br />Mark Cook stated that the Upper County Traffic Committee was <br />finalized, and staff has produced a Request for Information (RFI) <br />that was sent to two (2) On -Call Consultants for traffic solutions to <br />be discussed once they are submitted. Mark Cook continued that he <br />has scheduled calls to discuss the RFI with members of the Committee <br />and will send score sheets to the members once submittals are <br />received. No direction was given. <br />OTHER BUSINESS: <br />COUNTY ENGINEER UPDATE <br />Mark Cook reported that a County Engineer candidate will be traveling <br />from out of state for an interview on June 25th and would like to set <br />up a time for the Board to meet him. Staff was directed to schedule <br />time for each Board member to meet the candidate. <br />UPDATE <br />Mark Cook updated the Board on the upcoming construction projects for <br />the Department. Mark Cook stated that local contractors were awarded <br />two (2) projects and Big Boulder will be opened on the 9th. Mark <br />Cook continued that the Upper County Maintenance Facility was awarded <br />to a contractor from Spokane with a local contractor conducting the <br />site work; Belsaas and Smith was awarded the Coleman Creek project <br />and Advantage Dirt will be doing the Fairview Road project. Mark <br />Cook added that the Bullfrog Road project will be advertised next. <br />Mark Cook thanked the Board for their support in getting these <br />projects out and awarded. <br />INTERN DISCUSSION <br />Mark Cook stated that Public Works has had internships available in <br />the past for surveying and construction inspection. Mark Cook <br />continued that staff sees it as a good program to continue especially <br />with the Construction Management Program at Central Washington <br />University. Discussion was held. Staff was directed to work with <br />Human Resources to get this completed. <br />2020-06-08 MINUTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.