My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-122
>
Meetings
>
2020
>
06. June
>
2020-06-16 10:00 AM - Commissioners' Agenda
>
Res-2020-122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 9:26:01 AM
Creation date
6/23/2020 9:25:56 AM
Metadata
Fields
Template:
Meeting
Date
6/16/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Prospectus for the Bullfrog Road Project, CRP 300-20
Order
16
Placement
Consent Agenda
Row ID
63426
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Kittitas County Public Works <br />ProjectTitle <br />Bullfrog Road <br />Date <br />Right of Way <br />M ruo Right of Way Needed <br />* All construction required by the <br />contract can be accomplished <br />within the exiting right of way. <br />fl nignt of Way Needed <br />n ruo Relocation ln n"to"rton Required <br />I <br />Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project <br />There should not be any utility work required. If conflicts are discovered during design, the utilities will be <br />relocated by the owner prior to construction. <br />FAA lnvolvement <br />ls any airport located within 3.2 kilometers (2 miles) of the project? flves Z ruo <br />s project has been reviewed by the legislative body of rn n agency or agenctes, or <br />designee, and is not inconsistent with the agency's comprehensive <br />Agency <br />Date Qu.llLLlzpzn <br />DOT Form 14O-1O1 <br />Revised O4l2O15 <br />Utilities Railroad <br />M ttto utility work required <br />nnLt utilityworkwill be completed priorto the start <br />of the construction contract <br />nrul utility work will be completed in coordination <br />with the construction contract <br />M trto railroad work required <br />n rut railroad work will be completed prior to the start of <br />the construction contract <br />Ent the railroad work will be completed in coordination <br />with the construction contract <br />Remarks <br />By <br />Previous Editions Obsolete <br />for ity development. <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.