My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA Accurate Electric Unlimited Camera System
>
Meetings
>
2020
>
04. April
>
2020-04-21 10:00 AM - Commissioners' Agenda
>
PSA Accurate Electric Unlimited Camera System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 9:29:45 AM
Creation date
5/19/2020 9:29:30 AM
Metadata
Fields
Template:
Meeting
Date
4/21/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
h
Item
Request to Approve a Professional Services Agreement between Accurate Electric Unlimited and the Kittitas County Jail to Replace the Existing CCTV Recording System and Application Server
Order
8
Placement
Consent Agenda
Row ID
61782
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
coltH:rcnr .INDUSTTIAT <br />Kltlltas County Jail <br />Karn Balley <br />PROPOSAL FOR CCTV UPGRADE ANDCAMERA REPLACETUIENT <br />Accurate Electrlc unlimited (AEUI ls pleased to provide this proposal for labor and matertals for <br />the installation, programming, and tesilng of a upgrade of the CCTV system to Valerus as <br />described heretn for the lot sum total of $ 6a,sgr (uso, <br />EX|ST|NG CONDtTtotrts <br />The current jail ccrv camera system has reached the end of operational llfe. viconnet, Version <br />8, will no longer be support by the end of 2020. <br />pRoPosEp sor_uilory <br />AEU proposes to replace the CCW recording systern with a new Applicagon Server and <br />Recording Server. Both will be lntegrated into the sheriffs l.AN system where management and <br />viewing of vldeo can be accomplished at County provided workstation {must be approved and <br />have *edentials). <br />The recording server will have 83 TB of useable recordlng storage of video. Dependlng on <br />programming of the cameras, can exceed 90 days of recorded vlews. The appllcation server ls <br />the latest 17 gen with 16GB of RAM. AEU also lncludes allsoftware licenses and registration to <br />the County Sheriff. <br />SCHEDULE <br />AEU proposes the lnstallation be comBleted wlth One (ll on slte Journeymen wlth remoteprogrammlng by our software englneers.,.. ln 1 week. For the proJected three (31 mld-weekdaysthe technicians work on slte will be twelve {121 hour workdayi. nlu can be on sitc withln 35calendar days upon nofice to proceed,
The URL can be used to link to this page
Your browser does not support the video tag.