Laserfiche WebLink
coltH:rcnr .INDUSTTIAT <br />Kltlltas County Jail <br />Karn Balley <br />PROPOSAL FOR CCTV UPGRADE ANDCAMERA REPLACETUIENT <br />Accurate Electrlc unlimited (AEUI ls pleased to provide this proposal for labor and matertals for <br />the installation, programming, and tesilng of a upgrade of the CCTV system to Valerus as <br />described heretn for the lot sum total of $ 6a,sgr (uso, <br />EX|ST|NG CONDtTtotrts <br />The current jail ccrv camera system has reached the end of operational llfe. viconnet, Version <br />8, will no longer be support by the end of 2020. <br />pRoPosEp sor_uilory <br />AEU proposes to replace the CCW recording systern with a new Applicagon Server and <br />Recording Server. Both will be lntegrated into the sheriffs l.AN system where management and <br />viewing of vldeo can be accomplished at County provided workstation {must be approved and <br />have *edentials). <br />The recording server will have 83 TB of useable recordlng storage of video. Dependlng on <br />programming of the cameras, can exceed 90 days of recorded vlews. The appllcation server ls <br />the latest 17 gen with 16GB of RAM. AEU also lncludes allsoftware licenses and registration to <br />the County Sheriff. <br />SCHEDULE <br />AEU proposes the lnstallation be comBleted wlth One (ll on slte Journeymen wlth remoteprogrammlng by our software englneers.,.. ln 1 week. For the proJected three (31 mld-weekdaysthe technicians work on slte will be twelve {121 hour workdayi. nlu can be on sitc withln 35calendar days upon nofice to proceed,