My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-08-minutes-public-works-study-session
>
Meetings
>
2019
>
04. April
>
2019-04-16 10:00 AM - Commissioners' Agenda
>
2019-04-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:15:38 PM
Creation date
5/12/2020 2:13:29 PM
Metadata
Fields
Template:
Meeting
Date
4/16/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
52889
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mark Cook <br />From: Ben Annen 4bannen@hlac1vlI.comy <br />Sent: Friday, March 29,2019 1:35 PM <br />TO: Mark Cook; Taylor Gustafson <br />Cc: Robert Omans; Lucy Temple; Mike Engel hart; Jordan Preston <br />Subject: Cie Elum First Street 5tormwater and Billings Avenue Intersection Improvements CA <br />Review <br />HI Mark and Taylor, <br />Uploaded to the Sharepoint link for CA review are the Items listedd below for the City of Cie Elum's First Street <br />Stormwater and Billings Avenue Intersection Improvements project, FHWA Project Number STPR-0903: <br />1. Federal Authorization Package Checklist <br />2. Plans <br />3. Specifications <br />4. Engineer's Estimate <br />5. LAA <br />6. STIP <br />7. Prospectus Submittal Package <br />8. Design Approval Documentation <br />9. NEPA —Draft, awaiting DAHP concurrence prior to final NEPA <br />htt s: hl civil -m .share oint,corn.f: nnen EmCFfcAY!sdH m8Xi 9 MB - CSVPdPksKkeC4JOw?e=TLOd[}T <br />A hard copy document package was delivered to WSDOT Local Programs today. Bid advertisements are scheduled for <br />May 9, 2019 and May 16, 2019, followed by a bid opening on May 30, 2019. The construction contract will be <br />considered by City Council on lune 11, 2019. Following contract execution, a preconstrucdon meeting will be scheduled <br />for July 2, 2019, with construction beginning on July 8, 2019, and completed by October 28, 2019. Due to the late <br />season construction, it is critical all scheduled dates are met, and funding is expended in total during the 2019 calendar <br />year. <br />We look forward to any review comments you may have, and CA approval. <br />Please don't hesitate to call with any questions. <br />Thank you, <br />Benjamin A. Annen, PE <br />HLA Engineering and Land Surveying, inc <br />2803 River Road Yakima, WA 98902 <br />Phone. (509)966-7000 J Fax. (509)965-3sW <br />bannenp lacly Lcom J www.b&gbd.com <br />Hi,*r <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.