My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-11-minutes-public-works-study-session
>
Meetings
>
2019
>
03. March
>
2019-03-05 10:00 AM - Commissioners' Agenda
>
2019-02-11-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:58 PM
Creation date
5/12/2020 2:12:07 PM
Metadata
Fields
Template:
Meeting
Date
3/5/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
51926
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. i ne area or revision encompasses the following: <br />Structures: ❑ Channelization <br />Cl Dam <br />(check all that apply) <br />❑ LeveefFloodwall ❑ Bddge/Culvert <br />❑ Fill ❑ Other (Attach Description) <br />E ❑ Documentation of ESA compliance is submitted (required to initiate CLOMR review). Please refer to the instructions for more Information. <br />C. REVIEW FEE <br />Has the review fee for the appropriate request category been included? ® Yes Fee amount: $0 <br />❑ No, Attach Explanation <br />Please see the DHS -FEMA Web site at http://www.ferne.nov/plan/prewnYthmftrn fees. shtm For Fee Amounts and Exemptions, <br />D. SIGNATURE <br />All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by <br />fine or imprisonment under Title 18 of the United States Code, Section 1001. <br />Name. Company: <br />Mailing Address: Daytime Telephone No.: Fax No.: <br />E -Mail Address: <br />Signature of Requester (required): Date: <br />As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision <br />(LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all <br />of the community floodplain management requirements, including the requirements for when fill is placed in the regulatory floodway, and that all <br />necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. For Conditional LOMR requests, the <br />applicant has documented Endangered Species Act (ESA) compliance to FEMA prior to FEMA's review of the Conditional LOMR application. For <br />LOMR requests, i acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA's process. For actions <br />authorized, funded, or being carried out by Federal or State agencies, documentation from the agency showing its compliance with Section 7(a)(2) <br />of the ESA will be submitted. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are <br />or will be reasonably safe from flooding as defined In 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and <br />documentation used to make this determination. <br />Community Official's Name and Title: KiArk Sackett, ce%,*%V lyli� Corm Community Name: 611 of E11e nbuy <br />Mailing Address: 5b ( Int Anderson S'ee+ Daytime Telephone No.:Uq-941- 7257, Fax No.: 60q- 4'Zs- <br />EllrtnS6wj, WA 98RU. E -Mail Address: Satckt4k@el. elt'tr► Wrta. wa.us <br />Community Official's Signature (required): Date: r .•JJX 18 <br />CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER AND/OR LAND SURVEYOR <br />This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify <br />elevation information data, hydrologic and hydraulic analysis, and any other supporting information as per NFIP regulations paragraph 65.2(b) and as <br />described in the MT -2 Forms Instructions, All documents submitted in support of this request are correct to the best of my knowledge, I understand that <br />any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. <br />Certifier's Name: Christopher Frei License No.: 463513 Expiration Date: Jan 25, 2019 <br />Company Name: Watershed Science and Engineering Telephone No,: 206 5213000 Fax No.: N/A <br />Signature: Date: E -Mail Address: chris@watershedse.com <br />FEMA Form 086.0-27, (212011) Previously FEMA Form 81-89 MT -2 Form 1 Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.