My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-10-minutes-public-works-study-session
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
2018-12-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:51 PM
Creation date
5/12/2020 2:10:34 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
50104
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5CAnss ... ro <br />c � <br />KirnTAS MUNTY <br />3HCX=XTAB CO <br />DEPARTMENT OF PUBLIC WORKS <br />TASK 2.32 — Structural Special Provisions <br />TASK 2.33 — Cost Estimate <br />TASK 2.34 — Deliverable preparation <br />TASK 2.40 — Quality Control Checks and Reviews <br />TASK 2.50 — Technical Collaboration <br />Structural design engineers will coordinate with survey, civil, geotechnical, hydraulics and <br />environmental engineers for project design and contract coordination. <br />TASK 2.60 — Construction Support <br />If needed to provide support during construction to respond to RFI's and review submittals. <br />TASK 3 GEOTECHNICAL ENGINEERING <br />TASK 3.10 — Planning and Research <br />Hart Crowser will review readily available geologic maps and water well logs that cover the site <br />vicinity, and other reports and plans provided by others (if any) for general information <br />regarding subsurface soil and groundwater conditions and geologic hazards. <br />Hart Crowser will coordinate field explorations with KPFF, Kittitas County, USFS, drilling <br />subcontractors, and internal staff. If required, Hart Crowser will submit a traffic control plan for <br />review by the County. <br />TASK 3.20 — Field Work <br />TASK 3.21— Site Reconnaissance and Utility Locates <br />Hart Crowser will conduct a reconnaissance to get familiarized with the site. Relevant <br />features will be noted, and the proposed exploration location marked for the utility <br />locators. Hart Crowser will notify "One -Call" service for public utility locates. <br />TASK 3.22 — Field Explorations <br />Hart Crowser will advance one boring near the south side of the bridge. (The north side <br />of the bridge cannot be accessed with drilling equipment due to load restrictions.) The <br />
The URL can be used to link to this page
Your browser does not support the video tag.