Laserfiche WebLink
November 28, 2018 <br />Watershed Science 8, Engineering <br />WSE <br />BIG BOULDER CREEK BRIDGE REPLACEMENT <br />principal <br />F <br />senior <br />Engineer 1 <br />.junior <br />Engineer <br />Contract <br />Adminiatrelo <br />item <br />SCOPE OF WORK <br />$212.99 <br />$188.66 <br />$97.37 <br />$94.93 <br />1 <br />PROJECT MANAGEMENT <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />$0 <br />2 <br />tA1i <br />STRUCTURAL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />o <br />10 <br />GEOTECHNICAL ENGINEERING <br />Labor Subtotal: <br />0 <br />a <br />0 <br />0 <br />$0 <br />4 <br />HYDRAULIC ENGINEERING <br />4.10 <br />Data Collection and Review <br />2 <br />8 <br />$1,2:5 <br />4.20 Site inspection <br />8 <br />8 <br />$2,483 <br />4.30 <br />Channel survey <br />2 <br />4 <br />$e.8 <br />4.40 <br />Hydrology <br />2 <br />4 <br />$816 <br />4.50 <br />Hydraulic Analysis <br />2 <br />1 <br />20 <br />$2,682 <br />4.60 <br />Channel Stability and Scour Assessment <br />10 <br />16 <br />83,888 <br />4.70 <br />WDFW and Permit Coordination <br />12 <br />4 <br />52,945 <br />4.80 <br />Hydraulic Investigation Report <br />20 <br />4 <br />16 <br />$8,572 <br />4.90 <br />Meetings & Administration <br />10 <br />3 <br />2 <br />$2.612 <br />4.10 <br />Labor Subtotal: <br />88 <br />5 <br />83 <br />2 <br />$25,698 <br />8 <br />�...vtif i <br />ENVIRONMENTAL DOCUMENTATION 8 <br />PERMITTING <br />$216 <br />LaborSubtotal,1 <br />0 <br />0 <br />0 <br />$g <br />6 <br />CIVIL ENGINEERING <br />Labor Subtdal:l <br />0 <br />0 <br />0 <br />0 <br />$0 <br />- - <br />-1:Yrt1[:1 <br />.. .. <br />.. <br />Labor sum: <br />60 1 <br />0 <br />ns I <br />t I <br />il3,tiva <br />Reimbursable Sum: <br />$218 <br />Page 3 of 5 <br />