My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-10-minutes-public-works-study-session
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
2018-12-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:51 PM
Creation date
5/12/2020 2:10:34 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
50104
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 28, 201$ <br />KPFF Consulting Engineers <br />KPFF <br />BIG BOULDER CREEK BRIDGE REPLACEMENT <br />Principal <br />Manager <br />Manager <br />Technical <br />Specialist <br />Structural <br />Task Lead <br />Project <br />Engineer <br />CM <br />Terhniclan <br />Project <br />Coordinator <br />Hem I SCOPE OF WORK <br />$171.52 <br />$119.68 <br />$171.52 <br />$119.68 <br />$114.34 <br />L $121.86 <br />$76.24 <br />1 PROJECT MANAGEMENT <br />1.10 Project Team Management and Coordination <br />so <br />$7.181 <br />1.20 Monthly Progress ReporWrivoices <br />8 <br />12 <br />$1,872 <br />1.30 ;Monthly Project Progress MeetinpsMllnutes <br />16 <br />6 <br />$2,372 <br />140 'Coordination with WDFW <br />Labor.Subtotal: <br />a <br />a 92 <br />0 <br />0 <br />D <br />0 <br />18 <br />$957 <br />$12,383 <br />�_ " I.q .:, -• <br />$1,19.90 <br />515,873.00 <br />2. STRUCTURAL ENGINEERING <br />2.10 Project Kickoff Meeting and Site Visit <br />6 <br />t3 <br />$1;438 <br />2.20 Alternative Analysis Memo <br />2 <br />to <br />$2 ?56 <br />2.30 Development of PS&E/Contract'Bid Documents <br />2.37 Plan and Calculation Preparation <br />Cover Sheet <br />2 <br />2 <br />61' <br />General Notes, Quantities, <br />2 <br />4 <br />4 <br />20 <br />Bridge Layout - plan and elevation <br />4 <br />1 20 <br />8 <br />20 <br />B8, <br />Foundation Plan - Layout <br />2 <br />4 <br />16 <br />204 <br />Footing Details <br />2 <br />4 <br />16 <br />20 <br />$51184 <br />Win wall Layout I Details <br />2 <br />4 <br />16 <br />20 <br />W.06A <br />TemporarylDetour Bridge Layout <br />2 <br />4 <br />16 <br />20 <br />2.32 Structural. Special Provisions <br />4 <br />16 <br />8 <br />$5;S <br />2.33 Cost Estimate <br />2 <br />4 <br />8 <br />$� <br />2.34 J Deliverable Preparation (30%, 75%, 100% 2 hr. each) <br />1 6 <br />6 <br />6 <br />2 <br />52 <br />2.40 Quality Control Checks and Reviews <br />8 6 <br />e <br />aD <br />4 <br />4 <br />138° <br />2.50 Technical Collaboration (Survey, Civil, Geotechnical, <br />Hydraulics, Environmental <br />6 <br />16 <br />8 <br />e <br />5444 <br />2.60 Constriction Supppri (RFI',, Submittals, etc.) as needed <br />Labor Subtotal <br />9 12 <br />34 <br />8 <br />184 <br />$ <br />120 <br />144 <br />2 <br />51.872 <br />$56,070 <br />$0.00 <br />GEOTECHNICAL ENGINEERING <br />0 <br />Laborflubootal: <br />0 a <br />0 <br />0 <br />0 <br />o <br />a <br />$a <br />4 HYDRAULIC ENGINEERING <br />Labor subtotal: <br />a a0 <br />0 <br />$0.00 <br />$o <br />s <br />5 ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: <br />0 0 <br />1 0 <br />0 <br />0 <br />0 <br />a <br />$0.00 <br />$D <br />7 31i i .ia :.. <br />i3 CIVIL ENGINEERING <br />$0,00 <br />6.10 Project Management <br />2 <br />4 <br />$2,752 <br />6.20 P.S&E Sid Docs <br />Site Preparation Plan (9011 001100 Ad) <br />2 <br />14 <br />914 <br />Roadway plan and profile (30!90!100!100 Ad) <br />2 <br />20 <br />Typical Sections and Details (+30!100!100 Ad) <br />2 <br />12 <br />Detour plan, proftle & typical section (30/9011001100 Ad) <br />4 <br />24 <br />Full olosure signage plan <br />2 <br />1 12 <br />',2Stf <br />Civil Stream grading for bypass and/or abutments (no <br />draWin <br />2 <br />$21571 <br />Stomlvvater Site plan and CSPP <br />a <br />$3 e2ii <br />Civil Special Provisions <br />2 <br />m! <br />Civil Cost Estimate <br />2 <br />S1a00B <br />6.30 QC Reviews <br />6 <br />"l <br />6.40 Construction Support <br />2 <br />Labor Subtotal: <br />8 0 <br />0 <br />a <br />24 <br />1 90 <br />1 0 <br />$36,864 <br />r1r:lW,'. <br />sn.no <br />LaborSum:i <br />16 1 104 <br />1 34 <br />1 5.34 <br />' 144 <br />1 Asa <br />1 z4ius,eiils <br />Reimbursable Sum: <br />$120 <br />�� Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.