Laserfiche WebLink
rvcrvamr er co, cV r8 <br />Planning and Research <br />2 <br />Hart Cromer, Inc. <br />HC <br />BIG BOULDER CREEK BRIDGE <br />61 DD8 <br />3.20 <br />Field Work <br />6 CIVIL ENGINEERING <br />Labor Subtotal: o _ <br />0 <br />REPLACEMENT <br />Principal <br />Project <br />senior staff <br />Senior Drafter <br />Project <br />gssistant <br />_ Labor Sum: 2 <br />_ Reimbursable Sum: <br />hem ISCOPE OF WORK <br />$262.16 <br />$127.10 <br />$113.56 1 $112.93 <br />$105.60 <br />1 PROJECT MANAGEMENT <br />12 <br />$1752 <br />3.23 <br />Labor Subtotal: <br />o <br />0 <br />0 0 <br />0 $0 <br />— $gn - <br />3.30 <br />Office Work <br />N,STRUCTURAL ENGINEERING <br />3.31 <br />Engineering Analysis and Consultations <br />- Labor Subtotal: <br />0 <br />o <br />0 L 0 14 <br />;p <br />,GEOTECHNICAL ENGINEERING <br />Geotechnical Reporting <br />6 <br />12 <br />3 4 <br />3.90 <br />Planning and Research <br />2 <br />2 <br />2 <br />5 ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: 0 <br />61 DD8 <br />3.20 <br />Field Work <br />6 CIVIL ENGINEERING <br />Labor Subtotal: o _ <br />0 <br />" " -- <br />3.21 <br />Site Reconnaissance and Utility Locates <br />1 <br />_ Labor Sum: 2 <br />_ Reimbursable Sum: <br />35 <br />34 10 1--G !_ <br />3.22 <br />Field Explorations <br />1 <br />1 <br />12 <br />$1752 <br />3.23 <br />Sample Review & Laboratory Testing <br />4 <br />1 <br />— $gn - <br />3.30 <br />Office Work <br />3.31 <br />Engineering Analysis and Consultations <br />4 <br />16 <br />8 2 <br />T$4 217 <br />3.32 <br />Geotechnical Reporting <br />6 <br />12 <br />3 4 <br />4 <br />$4,313 <br />3.33 <br />Project Management and Meetings <br />8 <br />2 <br />$y13pg <br />3.40 <br />Construction Support <br />4 <br />Labor Subtotal:7 <br />36 <br />34 10 <br />6 <br />$15,705 <br />r nr vlWUL�V Cry{71 nICCRln119 <br />Labor Subtotal: o <br />0 <br />1 0 p o <br />$p <br />5 ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: 0 <br />p <br />o p p <br />$p <br />6 CIVIL ENGINEERING <br />Labor Subtotal: o _ <br />0 <br />$o <br />_ Labor Sum: 2 <br />_ Reimbursable Sum: <br />35 <br />34 10 1--G !_ <br />$16,766 <br />$8 423 <br />I(Pff <br />Page 2 of 5 <br />