My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-10-minutes-public-works-study-session
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
2018-12-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:51 PM
Creation date
5/12/2020 2:10:34 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
50104
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 28, 2018 <br />KPFF Consulting Engineers <br />KPFF <br />Project <br />BIG BOULDER CREEK BRIDGE REPLACEMENT Principal Manager <br />Technical Structural <br />Specialist Task Lead <br />Project <br />Engineer <br />CAD <br />Technician <br />Protect <br />Coordinator <br />Hem <br />SCOPE OF WORK $171.52 $119.68 <br />$171.52 <br />$119.68 <br />$114.34 <br />$121.66 <br />$76.24 <br />1 <br />PROJECT MANAGEMENT <br />1.10 <br />Project Team Management and Coordination <br />60 <br />$7,181 <br />1.20 <br />Monthly Progress Reports/Invoices <br />8 <br />12 <br />$1.872 <br />1.30 <br />Monthly Project Progress Meetings/Minutes <br />16 <br />6 <br />$2.372 <br />1.40 <br />Coordination with WDFW <br />8 <br />$957 <br />Labor Subtotal: <br />0_�_ 92 <br />0 <br />0 <br />o <br />0 _ <br />18 <br />$12,883 <br />_ <br />$119.90 <br />$15,673.00 <br />2 <br />STRUCTURAL ENGINEERING <br />2.10 <br />Project Kickoff Meeting and Site Visit <br />6 <br />6 <br />$1 436 <br />2.20 <br />Alternative Analysis Memo <br />2 <br />16 <br />$2.258 <br />2.30 <br />Development of PS&E/Contract Bid Documents <br />2.31 <br />Plan and Calculation Preparation <br />Cover Sheet <br />2 <br />2 <br />6 <br />$1198 <br />General Notes, Quantities, <br />2 <br />4 <br />4 <br />20 <br />$3.712 <br />Bridge Layout - plan and elevation <br />4 <br />20 <br />8 <br />20 <br />$6,428 <br />Foundation Plan - Layout <br />2 <br />4 <br />16 <br />20 <br />$5.084 <br />Footing Details <br />2 <br />4 <br />16 <br />1 20 <br />$5,094 <br />Wingwall Layout/ Details <br />2 <br />4 <br />16 <br />20 <br />$5,084 <br />Temporary/Detour Bridge Layout <br />2 <br />4 <br />16 <br />20 <br />$5:084 <br />2.32 <br />Structural Special Provisions <br />4 <br />16 <br />8 <br />$3.516 <br />2.33 <br />Cost Estimate <br />2 <br />4 <br />8 <br />$1736 <br />2.34 <br />Deliverable Preparation (30%, 75%, 100% 2 hr. each)6 <br />6 <br />6 <br />2 <br />$2,287 <br />2.40 <br />Quality Control Checks and Reviews <br />8 6 <br />6 <br />20 <br />4 <br />4 <br />$6,457 <br />Technical Collaboration (Survey, Civil, Geotechnical, <br />6 <br />16 <br />8 <br />B <br />$4.832 <br />2.50 <br />Hydraulics, Environmental <br />2.60 <br />Construction Support (RFI's, Submittals, etc.) as needed <br />a <br />a <br />31.872 <br />Labor Subtotal: <br />a 12 <br />34 <br />1 134 <br />120 <br />144 <br />2 <br />$56,070 <br />$0.00 <br />'• GEOTECHNICAL ENGINEERING <br />0 <br />Labor Subtotal: <br />0 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />$0.00 <br />4 <br />HYOFtALILIC ENGINEERING <br />Labor Subtotal: <br />o o <br />0 <br />n <br />o <br />0 <br />0 <br />$0 <br />F-VVIR-DNMENTAL DOCUMENTATION & <br />5 <br />PERMITTING <br />Labor Subtotal: <br />0 0 <br />0 <br />0 <br />_ D <br />0 <br />0 <br />$o <br />6 <br />CIVIL ENGINEERING <br />6,10 <br />1 Project Management <br />2 <br />4 <br />$2-752 <br />6-20 <br />PS&E Bid Docs <br />2 <br />14 <br />$4,079 <br />Site Preparation Plan (9011001100 Ad) <br />Roadway plan and profile (30190/100/100 Ad) <br />2 <br />2D <br />$5'590 <br />Typical Sections and Details (9011Doll 00 Ad) <br />2 <br />1 z <br />$8 200 <br />Detour plan, profile & typical section (301901100/100 Ad) <br />4 <br />24 <br />$6,500 <br />Full closure signage plan <br />2 <br />12 <br />$3,250 <br />Civil Stream grading for bypass and/or abutments (no <br />2 <br />$2571 <br />drawings) <br />8 <br />$2,925 <br />Stormwater Site plan and CSPP <br />Civil Special Provisions <br />2 <br />$1,400 <br />Civil Cost Estimate <br />2 <br />$1,009 <br />6.30 <br />QC Reviews <br />6 <br />$1029 <br />6.40 <br />COnstruCtion Su rt <br />2 <br />$1,009 <br />Labor Subtotal: <br />8 0 <br />0 <br />0 <br />24 <br />90 <br />0 <br />$55,364 <br />T—. <br />so 00 <br />U. — .. �7llrll: <br />io 1104 <br />.T4 <br />954 <br />744 <br />LJ4 <br />LV <br />fivu,816 <br />Reimbursable Sum: <br />$720 <br />icoff— <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.