My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-10-minutes-public-works-study-session
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
2018-12-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:51 PM
Creation date
5/12/2020 2:10:34 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
50104
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° � KZTTZTgiB CO <br />Mo <br />DEPARTMENT OF PUBLIC WORKS <br />IaTMAS <br />Hart Crowser will consult with the design team regarding their findings and foundation <br />alternatives. <br />TASK 3.32 — Geotechnical Reporting <br />Hart Crowser will prepare a geotechnical report to document their findings and <br />recommendations. The geotechnical report will address design and construction issues, <br />including: <br />• Site and boring location plan(s); <br />• Description of subsurface soil, rock, and groundwater conditions; <br />• Site preparation and earthwork recommendations; <br />• Seismic hazards and WSDOT-based seismic design parameters; <br />• Temporary and permanent abutment foundation alternatives, design <br />recommendations, and stability; <br />• Retaining wall alternatives and design parameters; and <br />• Construction considerations. <br />A draft report will be provided to the design team for review and comments. A final <br />report will be prepared that addresses review comments from the design team. <br />TASK 3.33 — Project Management and Meetings <br />Hart Crowser will provide geotechnical project management and support services, <br />including coordinating staff and subcontractors and conducting telephone consultations <br />and email communications with the design team. Hart Crowser will attend up to one <br />meeting at KPFF's office. <br />TASK 3.40 — Construction Support <br />The geotechnical engineer will provide support during construction to respond to RFI's or <br />changes in field conditions. <br />TASK 4 HYDRAULIC DESIGN <br />Watershed Science & Engineering (WSE) will provide hydraulic engineering services for the Big <br />Boulder Creek Bridge Replacement Project in Kittitas County, Washington. WSE will lead the <br />hydraulic engineering portions of the project which will include completing the following tasks. <br />TASK 4.10 — Data Collection and Review <br />WSE will collect and review existing data and information needed to complete the hydraulic <br />investigation. Data will include but not be limited to topographic maps including LiDAR data, <br />
The URL can be used to link to this page
Your browser does not support the video tag.