My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-23-minutes-public-works-study-session
>
Meetings
>
2018
>
11. November
>
2018-11-20 10:00 AM - Commissioners' Agenda
>
2017-10-23-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:11:54 PM
Creation date
5/12/2020 2:07:57 PM
Metadata
Fields
Template:
Meeting
Date
11/20/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
49352
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOARD OF COUNTY COMMISSIONERS <br />COUNTY OF KITTITAS <br />STATE OF WASHINGTON <br />RESOLUTION NO. 2017 - 1 —7 9% <br />TO AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO REMOVE THE <br />DAMAGED BRIDGE AT BAR 14 ROAD OVER NANEUM CREEK <br />WHEREAS: The bridge at Bar 14 Road over Naneum Creek suffered significant damage due to <br />debris buildup during flood events in the spring of 2017; and <br />WHEREAS: The bridge can no longer maintain a full service level, is restricted to a single lane <br />of traffic, and is functionally obsolete hydraulically; and <br />WHEREAS: Public Works has consulted with Northwest Hydraulic Consultants to seek options <br />and alternatives to alleviate flooding to neighboring residents and to improve the <br />functionality of the existing bridge resulting in the recommendation of the removal <br />of the existing structure and to perform minor grading in the immediate vicinity; <br />and <br />WHEREAS: Bridge replacement is not advisable until system wide, hydraulic improvements, <br />both upstream and downstream are completed; and <br />WHEREAS: Funding sources supporting the bridge replacement will be dismal due to the low <br />vehicle use of 57 average daily trips, and available detour routes within very short <br />distance; and <br />WHEREAS: Public Works will seek to construct turnarounds in the vicinity of the bridge in <br />2018; and <br />NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best <br />interest of the public, does hereby direct the Director of Public Works to remove <br />the damaged bridge at Bar 14 Road over Naneum Creek, perform required grading <br />in the immediate vicinity, and seek to construct turnarounds in 2018. <br />DATED on this 23rd day of October, 2017, at Ellensburg, Washington. <br />Attest: <br />D Clerk of the Board- Julie Kjorsvik <br />r 1OI1 r i <br />10 .'.�?e&,ty Clerk of the Board- Mandy Buchholz <br />lq. ........... <br />BOA COUNTY COMMISSIONERS <br />rAZTY, WASHINGTON <br />Paul rewell, Chairman <br />OPPOSED <br />Laura Os dacz, Vice-Clairman <br />Obie O Brien, Commissioner <br />
The URL can be used to link to this page
Your browser does not support the video tag.