Laserfiche WebLink
Priori 5: Huntzin er Rd Safft Improvements <br />i <br />• <br />Phase 1 is between MP 2.70 to MP 4.88 has several horizontal curves, steep embankments and <br />no shoulder in places with minimal countermeasures In place. <br />.� a3TIMATED COST $540,0W <br />Phase 2 Is between MP 5.14 to MP 6.99 where there is steep embankments, no shoulder in <br />areas and need of guardrail, signs and/or delineation. <br />n ESTIMATED COST S540.OW <br />Phase 3 is between MP 6.99 to MP 10.74 with sharp horizontal curves, vertical curves, steep <br />embankments, very little to no shoulder and Inadequate clear zone. <br />o ESTIMATED COSI" $540,000 <br />�. _ 26, ilk <br />IfNRM <br />I <br />r <br />f i <br />�.mo:eo'.xer <br />!!1j <br />• <br />Phase 1 is between MP 2.70 to MP 4.88 has several horizontal curves, steep embankments and <br />no shoulder in places with minimal countermeasures In place. <br />.� a3TIMATED COST $540,0W <br />Phase 2 Is between MP 5.14 to MP 6.99 where there is steep embankments, no shoulder in <br />areas and need of guardrail, signs and/or delineation. <br />n ESTIMATED COST S540.OW <br />Phase 3 is between MP 6.99 to MP 10.74 with sharp horizontal curves, vertical curves, steep <br />embankments, very little to no shoulder and Inadequate clear zone. <br />o ESTIMATED COSI" $540,000 <br />�. _ 26, ilk <br />