My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-22-minutes-public-works-study-session
>
Meetings
>
2018
>
11. November
>
2018-11-06 10:00 AM - Commissioners' Agenda
>
2017-05-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:10:01 PM
Creation date
5/12/2020 2:06:51 PM
Metadata
Fields
Template:
Meeting
Date
11/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
49048
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority #2: Bridge Rail improvements <br />Code 3 <br />Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures <br />o ESTIMATED COST $559,914 <br />Phase 21s within Gounty Maintenance District 6-1 with 21 bridges orstructures <br />o ESTIMATED COST $524,418 <br />Phase 3 Is within County Maintenance Districts J -L with 20 bridges orstructures <br />0 IcSTIMATEd COST <br />$597,233 <br />Bridges that have been coded <br />3 are severely inadequate <br />bridges or structures with <br />wood rail or no rail at all. <br />There will be three projects <br />by geographic location of <br />code 3 bridges to allow for <br />manageable and cost <br />conscious improvements. <br />17 <br />ra: <br />4�1i,a <br />s.JW;T. r� <br />�11�i�w► <br />HIr <br />�•1� 7Ci'■ <br />"1 l <br />Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures <br />o ESTIMATED COST $559,914 <br />Phase 21s within Gounty Maintenance District 6-1 with 21 bridges orstructures <br />o ESTIMATED COST $524,418 <br />Phase 3 Is within County Maintenance Districts J -L with 20 bridges orstructures <br />0 IcSTIMATEd COST <br />$597,233 <br />Bridges that have been coded <br />3 are severely inadequate <br />bridges or structures with <br />wood rail or no rail at all. <br />There will be three projects <br />by geographic location of <br />code 3 bridges to allow for <br />manageable and cost <br />conscious improvements. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.