Laserfiche WebLink
Priority #2: Bridge Rail improvements <br />Code 3 <br />Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures <br />o ESTIMATED COST $559,914 <br />Phase 21s within Gounty Maintenance District 6-1 with 21 bridges orstructures <br />o ESTIMATED COST $524,418 <br />Phase 3 Is within County Maintenance Districts J -L with 20 bridges orstructures <br />0 IcSTIMATEd COST <br />$597,233 <br />Bridges that have been coded <br />3 are severely inadequate <br />bridges or structures with <br />wood rail or no rail at all. <br />There will be three projects <br />by geographic location of <br />code 3 bridges to allow for <br />manageable and cost <br />conscious improvements. <br />17 <br />ra: <br />4�1i,a <br />s.JW;T. r� <br />�11�i�w► <br />HIr <br />�•1� 7Ci'■ <br />"1 l <br />Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures <br />o ESTIMATED COST $559,914 <br />Phase 21s within Gounty Maintenance District 6-1 with 21 bridges orstructures <br />o ESTIMATED COST $524,418 <br />Phase 3 Is within County Maintenance Districts J -L with 20 bridges orstructures <br />0 IcSTIMATEd COST <br />$597,233 <br />Bridges that have been coded <br />3 are severely inadequate <br />bridges or structures with <br />wood rail or no rail at all. <br />There will be three projects <br />by geographic location of <br />code 3 bridges to allow for <br />manageable and cost <br />conscious improvements. <br />17 <br />