Laserfiche WebLink
Priority 7: Bridge Rail improvements <br />Code 1 <br />• Phase 1 is within County Maintenance Districts A -D with 2 bridges or structures <br />ESTIMATED COST $389,540 <br />Phase 2 is within County Maintenance District E with 1 bridges or structures <br />o ESTIMATED COST $938,840 <br />• Phase 3 is within County Maintenance District F -L with 17 bridges or structures <br />o ESTIMATED COST $429,573 <br />• These bridges or structures will <br />need upgraded rail and <br />approaches to be brought up to <br />standards to prevent serious <br />injury or fatality accidents if <br />collision should occur. <br />22 <br />