My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-22-minutes-public-works-study-session
>
Meetings
>
2018
>
11. November
>
2018-11-06 10:00 AM - Commissioners' Agenda
>
2017-05-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:10:01 PM
Creation date
5/12/2020 2:06:51 PM
Metadata
Fields
Template:
Meeting
Date
11/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
49048
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority 5:Huntzinger Rd Safety Improvements <br />V r � -iAIPV <br />�Ceeb. <br />• Phase 1 is between MP 2.70 to MP 4.88 has several horizontal curves, steep embankments and <br />no shoulder in places with minimal countermeasures in place. <br />0 ESTIMATED COST $540,000 <br />• Phase 2 is between MP 5.14 to MP 6.99 where there is steep embankments, no shoulder in <br />areas and need of guardrail, signs and/or delineation. <br />o ESTIMATED COST $540,000 <br />• Phase 3 is between MP 6.99 to MP 10.74 with sharp horizontal curves, vertical curves, steep <br />embankments, very little to no shoulder and inadequate clear zone. <br />ESTIMATED COST $540,000 <br />ZU <br />
The URL can be used to link to this page
Your browser does not support the video tag.