Laserfiche WebLink
Priority 5:Huntzinger Rd Safety Improvements <br />V r � -iAIPV <br />�Ceeb. <br />• Phase 1 is between MP 2.70 to MP 4.88 has several horizontal curves, steep embankments and <br />no shoulder in places with minimal countermeasures in place. <br />0 ESTIMATED COST $540,000 <br />• Phase 2 is between MP 5.14 to MP 6.99 where there is steep embankments, no shoulder in <br />areas and need of guardrail, signs and/or delineation. <br />o ESTIMATED COST $540,000 <br />• Phase 3 is between MP 6.99 to MP 10.74 with sharp horizontal curves, vertical curves, steep <br />embankments, very little to no shoulder and inadequate clear zone. <br />ESTIMATED COST $540,000 <br />ZU <br />