Laserfiche WebLink
Priority #2: Bridge Rail Improvements <br />Code 3 <br />• Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures <br />o ESTIMATED COST $559,914 <br />• Phase 2 is within County Maintenance District G-1 with 21 bridges or structures <br />o ESTIMATED COST $524,418 <br />• Phase 3 is within County Maintenance Districts J -L with 20 bridges or structures <br />o ESTIMATED COST <br />$597,233 wow <br />• Bridges that have been coded <br />3 are severely inadequate <br />bridges or structures with <br />wood rail or no rail at all. <br />• There will be three projects <br />by geographic location of <br />code 3 bridges to allow for <br />manageable and cost <br />conscious improvements. <br />1E - -1 !-- <br />f .. <br />17 <br />Rik <br />,I <br />• Phase 1 is within County Maintenance Districts A -F with 19 bridges or structures <br />o ESTIMATED COST $559,914 <br />• Phase 2 is within County Maintenance District G-1 with 21 bridges or structures <br />o ESTIMATED COST $524,418 <br />• Phase 3 is within County Maintenance Districts J -L with 20 bridges or structures <br />o ESTIMATED COST <br />$597,233 wow <br />• Bridges that have been coded <br />3 are severely inadequate <br />bridges or structures with <br />wood rail or no rail at all. <br />• There will be three projects <br />by geographic location of <br />code 3 bridges to allow for <br />manageable and cost <br />conscious improvements. <br />1E - -1 !-- <br />f .. <br />17 <br />