My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-22-minutes-public-works-study-session
>
Meetings
>
2018
>
11. November
>
2018-11-06 10:00 AM - Commissioners' Agenda
>
2017-05-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:10:01 PM
Creation date
5/12/2020 2:06:51 PM
Metadata
Fields
Template:
Meeting
Date
11/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
49048
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
priority 2, this project will be broken into 7 phases to create more manageable projects for <br />design and construction. <br />7. Bridge Rail Improvements -Code 1 <br />a. Phase 1- County Maintenance Districts A -D <br />L 2 bridges or structures <br />b. Phase 2- County Maintenance District E <br />i. 1 bridge or structure <br />c. Phase 3- County Maintenance Districts F -L <br />i. 15 bridges or structures <br />These bridges were identified with lower risk because they feature bridge rail and approaches; <br />however, the rail and/or approaches and terminal do not meet current standards for <br />crashworthiness and will need to be upgraded to maintain adequate protection for errant <br />vehicles. There are 18 bridges and/or structures that have been rated as Code 1. These <br />structures have rail and approaches yet do not meet code. The priority is low on this project as <br />the bridges are functional but will need updated railing in the future to assist in preventing <br />serious injury or fatal accidents. <br />8. Corridor and Intersection Safety Improvements <br />This project provides corridor -wide improvements for the entire length of Vantage Highway with <br />intersection improvements for No. 6 Rd and Vantage Hwy. As well as two other intersections <br />along Kittitas Hwy at Matthews Rd and No. 6 Rd which have been identified for safety <br />improvements. Both Vantage Hwy and Kittitas Hwy are high -ADT corridors with an overall <br />roadway that is in good condition with appropriate countermeasures in place. This project <br />would provide monitoring and identification of potential spot -improvements to areas within the <br />Vantage Hwy corridor that may warrant updated safety features. While several segments of <br />Vantage Highway scored high in risk-based prioritization, the evaluation of the accident types <br />did not. Kittitas County recognizes that improvements to this corridor may provide benefit to a <br />great number of travelers, and any improvements that could reduce potential future crashes are <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.