My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-08-minutes-public-works-study-session
>
Meetings
>
2018
>
10. October
>
2018-10-16 10:00 AM - Commissioners' Agenda
>
2018-10-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:06:52 PM
Creation date
5/12/2020 2:06:06 PM
Metadata
Fields
Template:
Meeting
Date
10/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
48517
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 11. Twenty Year Project List <br />Roadway <br />Investments <br />Cost <br />Score <br />1 <br />Bender Road - Widening and Pedestrian Improvements <br />$3,300,000 <br />22 <br />2 <br />Manastash Road Creek Bank Stabilization and Snow Park Improvements <br />$2,400,000 <br />18 <br />5 Ellensburg Greenway John Wayne Trail Reconnection <br />Milepost 10.65 to 11.01 <br />14 <br />6 River to Rodeo Trail <br />3 <br />Fairview Road Widening & Coleman Creek Structures, Brick Mill Road to Rader Road <br />$2,250,000 <br />17 <br />8 Reecer Creek Trail <br />Milepost 5.03-6.05 <br />9 City Parks Trail <br />14 <br />4 <br />Manastash Road Bridge <br />$2,500,000 <br />16 <br />Milepost 10.567 - 10.633 (State Funding Secured) <br />5 <br />Reecer Creek Road - advanced warning signs <br />$20,000 <br />16 <br />Milepost 0.26 - 0.312 <br />6 <br />Reecer Creek Road - curves that need advanced warning signs, chevrons <br />$20,000 <br />16 <br />Milepost 4.80-6.68 <br />7 <br />Denmark Road Safety Improvements - railing Milepost 0.50-3.08, countermeasures <br />$385,684 <br />16 <br />Milepost 3.08-4.35 <br />8 <br />Brick Mill Road Bridge over Naneum Creek <br />$1,500,000 <br />15 <br />Milepost 0.10 East Naneum Road <br />9 <br />Fairview Road Bridge over Coleman Creek <br />$2,500,000 <br />1s <br />Milepost 0.23 North of Brickmill Road <br />10 <br />Bowers Road Extension <br />$1,675,000 <br />13 <br />11 <br />Bender Road to Dry Creek Road Connector <br />$1,500,000 <br />10 <br />12 <br />Brick Mill Road & Wilson Creek Road - four way stop controlled intersection <br />$20,500 <br />2 <br />13 <br />Kittitas Highway & Number 6 Road - four way stop controlled intersection <br />$750,000 <br />2 <br />14 <br />Vantage Highway & Number 6 Road - four way stop controlled intersection <br />$750,000 <br />2 <br />Total: $19,571,184 <br />Nonmotorized Projects <br />1 Canyon Road on road bike trail -City Limits to SR 821 (No Widening) <br />Cost <br />$500,000 <br />Score <br />17 <br />2 Reecer Creek Road on road bike trail - University Way to Bowers Road (No Widening) <br />$125,000 <br />17 <br />3 Hansen Pits Park Master Plan - West of Tjossem Road / Canyon Road intersection <br />$25,000 <br />14 <br />4 Cie Elum Pedestrian Bridge - S. Cie Elum Bridge Vicinity <br />$1;250;000 <br />14 <br />5 Ellensburg Greenway John Wayne Trail Reconnection <br />$1,000,000 <br />14 <br />6 River to Rodeo Trail <br />$2,000,000 <br />14 <br />7 McCabe Ringer Loop <br />14 <br />8 Reecer Creek Trail <br />14 <br />9 City Parks Trail <br />14 <br />10 Bureau of Reclamation (BOR) Trail <br />14 <br />11 Spray Fields Trail <br />14 <br />So1Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.