My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-10-minutes-public-works-study-session
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
2018-09-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:09:09 PM
Creation date
5/12/2020 2:05:22 PM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
48177
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 ofS I issue bate: April 2, 2018 Effective Date: August 17, 2018 I Case No.: 17-10-1541P LOMB -APP <br />p�YOwN <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br />'rvn sic <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br />COMMUNITY INFORMATION <br />APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION <br />We have made this determination pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (P.L. 93-234) and in accordance <br />with the National Flood Insurance Act of 1968, as amended (Title XIII of the Housing and Urban Development Act of 1968, P.L. 90-448), <br />42 U.S.C. 40014128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as amended, <br />communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or exceed NFIP <br />criteria. These criteria, including adoption of the FES report and FIRM, and the modifications made by this LOMB, are the minimum <br />requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements to which <br />the regulations apply. <br />We provide the floodway designation to your community as a tool to regulate floodplain development. Therefore, the floodway revision <br />we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate <br />community action, as specified in Paragraph 60.3(d) of the NFIP regulations. <br />COMMUNITY REMINDERS <br />We based this determination on the 1 -percent -annual -chance discharges computed in the submitted hydrologic model. Future <br />development of projects upstream could cause increased discharges, which could cause increased flood hazards. A comprehensive <br />restudy of your community's flood hazards would consider the cumulative effects of development on discharges and could, therefore, <br />indicate that greater flood hazards exist in this area. <br />Your community must regulate all proposed floodplain development and ensure that permits required by Federal and/or <br />State/Commonwealth law have been obtained. State/Commonwealth or community officials, based on knowledge of local conditions <br />and in the interest of safety, may set higher standards for construction or may limit development .in floodplain areas. If your <br />State/Commonwealth or community has adopted more restrictive or comprehensive floodplain management criteria, those criteria take <br />precedence over the minimum NFIP requirements. <br />We will not print and distribute this LOMR to primary users, such as local insurance agents or mortgage lenders; instead, the community <br />will serve as a repository for the new data. We encourage you to disseminate the information in this LOMB by preparing a news release <br />for publication in your community's newspaper that describes the revision and explains how your community will provide the data and <br />help interpret the NFIP maps. In that way, interested persons, such as property owners, insurance agents, and mortgage lenders, can <br />benefit from the information. <br />This determination is based on the Rood data presently available. The enclosed documents provide additional information regarding this determination. If you have <br />any questions about this document, please contact the FEMA Map Information eXchange toe free at 1-877-336-2627 (1 -877 -FEMA MAP) or by letter addressed to the <br />LOMC Clearinghouse, 3601 Eisenhower Avenue, Suite 500, Alexandria, VA 22304-6426. Additional h1formation about the NFIP is available on our website at <br />http:/AVww.fama.gaVlnfip. <br />a_4 <br />Patrick 'Rick" F. Sacbibft, P.E.. Branch Chief <br />Engineering Services Branch <br />Federal Insurance and Mitigation Administration 17-10-1541P 102 -1 -A -C <br />
The URL can be used to link to this page
Your browser does not support the video tag.