My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-27-minutes-public-works-study-session
>
Meetings
>
2018
>
09. September
>
2018-09-18 10:00 AM - Commissioners' Agenda
>
2018-08-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:06:00 PM
Creation date
5/12/2020 2:05:11 PM
Metadata
Fields
Template:
Meeting
Date
9/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
47908
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: August 27, 2018 <br />ACTION REQUESTED: Approve a Resolution to Authorize the Chair's Signature <br />on Jacobs Engineering Group Task Order No. 16 — <br />Fairview Road Culvert Replacement <br />BACKGROUND: During a routine bridge inspection in late 2017, significant <br />deterioration of two separate bridge abutment walls caused <br />Public Works to install temporary steel plates spanning the <br />bridge. Subsequent evaluation of stream channel alignment <br />suggests re -alignment of Coleman Creek is desired along <br />with bridge replacement. Jacobs Engineering Group is <br />offering structural engineering, hydraulic, geologic and <br />environmental supports services implementing necessary <br />repairs. The cost of design services is $222,025. Public <br />Works will design all civil engineering elements of the <br />project. <br />INTERACTION: Public Works; Jacobs Engineering Group <br />RECOMMENDATION: Approve the Resolution to Authorize the Chair's signature <br />on Jacobs Engineering Group Task Order No. 16. <br />HANDLING: Return one original to Public Works <br />ATTACHMENTS: Resolution; Task Order No. 16 <br />LEAD STAFF: Mark R. Cook, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.