My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-25-minutes-public-works-study-session
>
Meetings
>
2018
>
07. July
>
2018-07-17 10:00 AM - Commissioners' Agenda
>
2018-06-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:04:54 PM
Creation date
5/12/2020 2:00:53 PM
Metadata
Fields
Template:
Meeting
Date
7/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
46299
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: June 25, 2018 <br />TOPIC: Proposed Code Amendment to Title 12 "Roads and Bridges" <br />ACTION REQUESTED: Formulate a Focus Group Reviewing Revised Road <br />Standards <br />LEAD STAFF: <br />Mark R. Cook <br />RECOMMENDATION: <br />Direct that staff formulate a focus group reviewing and advising changes to staffs <br />proposed road standards for 2019 deployment_ <br />BRIEFING SUMMARY: <br />• Current road standards reflect 2005 base standards <br />• No significant changes in the past thirteen years <br />• Recently completed 20 year plan informs changes required with existing <br />standards <br />• Full package is now available for review and comment <br />• PW desires moving the standards through this comprehensive plan cycle <br />BACKGROUND: <br />The current road standards were most recently revised in 2015. While the revision <br />sought to "clean up" issues resident from 2005; it was not intended to be a complete <br />revision. During the past several years, PW has been noting desired changes and in early <br />2017 PW began working on making revisions. <br />During July 2017, PW determined that consultant support was the likely best project <br />delivery option. We worked back and forth with KPG staff over the course of ten months <br />producing the current draft. <br />DISCUSSION: <br />The proposed standards represent the tirst comprehensive approach to road standards in <br />the past 15 years. The current standards are designed with the users in mind. The <br />proposed standards represent our best attempt at producing a product that is easily used <br />by development engineers. Complete roadway cross-sections and supporting graphics <br />now accompany the standards. Two model county standards were evaluated: Lewis and <br />Chelan. <br />Page 1 of 3 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.