My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-25-minutes-public-works-study-session
>
Meetings
>
2018
>
07. July
>
2018-07-17 10:00 AM - Commissioners' Agenda
>
2018-06-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:04:54 PM
Creation date
5/12/2020 2:00:53 PM
Metadata
Fields
Template:
Meeting
Date
7/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
46299
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the County for appropriate sampling and testing after -the -fact, with certification, either by a qualified <br />private engineer or by County personnel. Costs of such testing and certification shall be the responsibility <br />of the developer. If the County Engineer requires further sampling, testing or certification, further work on <br />the development may be prohibited or limited per KCC 12.01.060 until all directed tests have been <br />completed and corrections made to the satisfaction of the County Engineer. <br />Article H. Construction Requirements and Ins ection <br />12.05.02.010 Purpose. <br />See KCC 12.05.01.010 and KCC 12.01.010 <br />12.05.02.020 Applicability. <br />See KCC 12.05.01.020 and KCC 12.01.020 <br />12.05.02.030 Basis for Control of Work <br />The basis for control of work shall be as follows: <br />A. Work performed for the construction or improvement of public or private roads in association <br />with land development shall be completed in accordance with the approved plans, and these <br />standards. No work shall be started until such plans are approved by the County Engineer. Any <br />revision to plans shall be approved by the County Engineer before being implemented. Failure to <br />receive the county's approval can result in removal or modification of construction at the <br />contractor's or applicant's expense to bring it into conformance with approved plans and these <br />standards. <br />B. It is the responsibility of the applicant, contractor, and their agents to have an approved set of <br />plans and any necessary permits on the job site wherever work is being accomplished. <br />C. The county shall have the authority to enforce these standards, as well as all other referenced or <br />pertinent specifications. The County Engineer will appoint designees, project engineers, <br />assistants, and inspectors as necessary to inspect the work, and they will exercise such authority <br />as the County Engineer may delegate. <br />D. It is the responsibility of the applicant, contractor, or their agents to notify the county in advance <br />of beginning work on any project. A pre -construction meeting and/or field review shall be <br />required before the commencement of work. <br />E. Failure to comply with the provisions of these standards may result in stop work orders, removal <br />of work accomplished, or other penalties as established by law. <br />F. Provisions of Section 1-05 (Control of Work) of the WSDOT Standard Specifications, most recent <br />edition, shall apply, with the term "Engineer" therein construed to be the County Engineer. <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft for Adoption 6/12/2018 <br />94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.