My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-29-minutes-public-works-study-session
>
Meetings
>
2018
>
06. June
>
2018-06-19 10:00 AM - Commissioners' Agenda
>
2018-05-29-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:03:59 PM
Creation date
5/12/2020 1:59:32 PM
Metadata
Fields
Template:
Meeting
Date
6/19/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
45638
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 12: You must include the key assumptions (if any) and their justifications, methodology, <br />and calculations upon which your jobs createdlretained estimate is based. Simply providing a <br />number or approximate number will not be considered a complete answer and will result in your <br />application being rejected from consideration. <br />Potential Example Answer for Question 12: <br />We have completed a survey of local contractors likely to bid on a project such as this. Ourresults <br />(data provided as attachment) shown that due to current economic conditions, a greater supply for <br />building services necessary for this project exists in the local market than demand for those services. <br />As a result, most of those surveyed indicate lower levels of employment than in the past, including <br />reducing workforce levels up to 50% and/or intermittent work with extended periods of temporary <br />layoffs due to lack of work <br />A project this size, according to our estimates (data provided as attachment) will require (X) skilled <br />construction laborers for approximately (Xperiod of time), (X) subcontractors employing (X) <br />laborers for approximately (X period of time), and well as (X) support staff (administrative, clerical, <br />management) for (Xperlod time). 77w agency will also be employing a halftime project manager to <br />oversee the project. <br />Most studies (two examples attached) believe that Washington State's building industry is only <br />beginning to recover and may never reach employment levels previously seen. Keeping that in mind <br />and being conservative while taking into account the current economic environment of Upper Kittitas <br />County and especially the depressed construction industry, we estimate at least (x) jobs will be <br />retained for at least (Ag months (the term of the construction phase of the project). In addition, as the <br />agency does not currently employ a qual fled project manager, at least one part-time professional jab <br />will be created for the same period <br />This, of course does not consider any impact to other local suppliers and supporting businesses <br />which will certainly provide services for this project as well as those who are directly employed as a <br />result of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.