My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iv. Inspection procedures. <br />V. Ways to perform their job activities to prevent or minimize impacts <br />to water quality. <br />vi. Procedures for reporting water quality concerns, including potential <br />illicit discharges, including spills. <br />S7. COMPLIANCE WITH TOTAL MAXIMUM DAILY LOAD REQUIREMENTS <br />The following requirements apply if an applicable TMDL is approved for stormwater <br />discharges from MS4s owned or operated by the Permittee. Applicable TMDLs are <br />TMDLs which have been approved by EPA on or before the issuance date of this permit, or <br />prior to the date that Ecology issues coverage, whichever is later. <br />A. For applicable TMDLs listed in Appendix 2, affected Permittees shall comply with <br />the specific requirements identified in Appendix 2. Each Permittee shall keep records <br />of all actions required by this permit that are relevant to applicable TMDLs within <br />their jurisdiction. The status of the TMDL implementation shall be included as part of <br />the annual report submitted to Ecology. Each annual report shall include a summary <br />of relevant SWMP and Appendix 2 activities conducted in the TMDL area to address <br />the applicable TMDL parameter(s). <br />B. For applicable TMDLs not listed in Appendix 2, compliance with this permit shall <br />constitute compliance with those TMDLs. <br />C. For TMDLs that are approved by EPA after this permit is issued, Ecology may <br />establish TMDL-related permit requirements through future permit modification if <br />Ecology determines implementation of actions, monitoring or reporting necessary to <br />demonstrate reasonable further progress toward achieving TMDL waste load <br />allocations, and other targets, are not occurring and shall be implemented during the <br />term of this permit or when this permit is reissued. Permittees are encouraged to <br />participate in development of TMDLs within their jurisdiction and to begin <br />implementation. <br />S8. MONITORING AND ASSESSMENT <br />A. All Permittees including Secondary Permittees shall provide, in each annual report, a <br />description of any stormwater monitoring or stormwater-related studies conducted by <br />the Permittee during the reporting period. If other stormwater monitoring or <br />stormwater-related studies were conducted on behalf of the Permittee during the <br />reporting period, or if stormwater-related investigations conducted by other entities <br />were reported to the Permittee during the reporting period, a brief description of the <br />type of information gathered or received shall be included in the annual report. <br />Eastern Washington Phase II Municipal Stormwater Permit — August 1, 2014 <br />Page 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.