My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eastern Washington Phase II Municipal Stormwater Permit <br />S6.D.4 Construction Site Stormwater Control <br />16. YES ❑ NO ❑ <br />Complied with all relevant ordinances, rules, and regulations of the local <br />NA <br />jurisdiction(s) that govern construction phase stormwater pollution <br />prevention activities, if applicable. (Required after initial date of permit <br />coverage, S6.D.4.a) <br />Comments: <br />17. YES ❑ NO <br />Ensured that all applicable construction projects under the functional <br />control of the Secondary Permittee obtained NPDES permit coverage. <br />(Required after initial date of permit coverage, S6.D.4.b) <br />Comments: <br />18. YES ❑ NO ❑ <br />Coordinated with local jurisdictions on construction projects owned or <br />NA ❑ <br />operated by other entities that discharge into Secondary Permittee's MS4 <br />as per S6.D.4.c. (Required after initial date of permit coverage) <br />Comments: <br />19. YES NO ❑ <br />Provided training for relevant staff in erosion and sediment control BMPs <br />NA ❑ <br />and requirements, or hired trained contractors to perform the work for all <br />construction projects owned and operated by the Secondary Permittee. <br />(Required after initial date of permit coverage, S6.D.4.d) <br />Comments: <br />20. YES ❑ NO ❑ Provided access, as requested, for inspection of construction sites <br />NA ❑ under the control of the Secondary Permittee during the land disturbing <br />activity and/or construction period. (Required after initial date of permit <br />coverage, S6.D.4.e) <br />Comments: <br />August 1, 2014 Appendix 4: ,Secondary Perinittee Annual Report Page 4 (?/'10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.